| Plan Review Notes For Project Z13040022 |
| Project Number |
Z13040022 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-05-08 11:53:23 | 1. PROVIDE COPY OF SFWMD ERP OR NO-NOTICE PERMIT PRIOR | | | TO START OF CONSTRUCTION. | | | 2. PROVIDE COPY OF NPDES NOI PERMIT PRIOR TO START OF | | | CONSTRUCTION. | | | 3. PROVIDE DRAINAGE CALCULATIONS, INCLUDING LAND USE | | | BREAKDOWN (PERVIOUS, IMPERVIOUS, BUILDING, ETC), WATER | | | QUALITY TREATMENT, ETC., WITH THE CITY'S ENGINEERING | | | PERMIT APPLICATION. | | | 4. PROVIDE SWPPP PLAN WITH THE CITY'S ENGINEERING | | | PERMIT APPLICATION. | | | 5. NO ENGINEERING PLANS OR CALCULATIONS PROVIDED. | | | 6. RELOCATE PROPOSED RETENTION AREA OUT OF THE UTILITIY | | | EASEMENT. | | | 7. RELOCATE PROPOSED TREE FROM UTILITY EASEMENT. | | | 8. ELEVATIONS TO BE IN REFERENCE TO NGVD 1929. | | | 9. PROPOSED GRAVITY SEWER MAY "FIT" INSIDE THE 25' | | | UTILITY EASEMENT. THE UE MAY CONTAIN A PUBLIC WATER | | | MAIN, PRIVATE FORCE MAIN AND OVERHEAD ELECTRIC. | | | 10. WILL SITE HAVE MASTER WATER METER OR WILL EASEMENTS | | | BE PROVIDED OVER THE WATER MAIN? | | | 11. SHOW EXISTING AND PROPOSED UTILITIES ON THE | | | LANDSCAPE PLANS. | | | 12. FPL EASEMENT DIMENSION NOT SHOWN IN RIGHT PLACE ON | | | LANDSCAPE PLANS. | | | 13. RETENTION AREA SHOULD BE LABELED PHASE 1 ON | | | LANDSCAPE PLANS. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 | | | |
| |
Print |
|