2013-11-19 16:33:351. LANDSCAPE DRAWINGS WERE NOT RESUBMITTED ADDRESSING
 THE PREVIOUS COMMENTS AND THE CONDITIONS OF APPROVAL
 FROM DAC.
 2. PREVIOUS COMMENTS: PLEASE SHOW PROJECTION OF THE 8TH
 STORY BUILDING ON OLIVE AVENUE ON THE 6TH STREET
 ELEVATION TO ACCURATELY REFLECT THE PROPOSED BUILDING
 HEIGHT.
 3. PREVIOUS COMMENT: PLEASE INDICATE LOCATION OF
 VISITOR PARKING.
 4. PREVIOUS COMMENT NUMBER 18 NOT ADDRESSED. GRADE
 LEVELS WILL BE NEEDED FOR BUILDING PERMIT.
 5. DIXIE HWAY ELEVATION FOR SOUTH BLOCK IS NOT
 CONSISTENT WITH FLOOR PLANS (RETAIL DOORS).
 6. SHEET A-2.11 STILL SHOWS TRASH HOLDING AREA. PLEASE
 REMOVE.
 7. WHY IS THE SIDEWALK CROSSING UNDER PEDESTRIAN BRIDGE
 NOT MAINTAINED AT GRADE?
 8. PUNCH OPENING SHALL BE INSTALL ON THE SOUTHEAST
 LOWER LEVEL OF THE PHASE II GARAGE.
 9. NORTH FACADE OF PHASE II GARAGE SHALL SHOW THE LOWER
 WALL ON EAST SIDE OF LOADING AREA. HOW IS THAT WALL
 IMPACTING THE ADJACENT PROPERTY?
 10. PLEASE SUBMIT THE FINAL ROAD CONFIGURATION
 INCORPORATED WITH THE SITE PLAN (PLEASE INCLUDE
 EXISTING CONDITIONS AND PROPOSED)
 11. PLEASE INCLUDE THE ROW LINE ON ALL THE DRAWINGS.
 12. DAC CONDITIONS OF APPROVAL:
 - TREATMENT ON NORTH FACADE OF PHASE II GARAGE SHALL
 TURN THE CORNER. USE SAME COLORS, SAME SCORING LINES.
 - AWNINGS SHALL BE LOWERED, THEY ARE CURRENLTY SHOWN AT
 10 FEET IN HEIGHT. DAC REQUIRED THEM TO BE LOWERED TO
 PEDESTRIAN SCALE (8').
 - LANDSCAPE DRAWINGS WERE NOT SUBMITTED. DAC REQUIRED
 ADDITIONAL SMALL TREES ALONG LOADING DOCK AND EAST
 ELEVATION ON PHASE II GARAGE.
 FOR ADDITONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439.
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved