| Plan Review Notes For Project Z13040019 |
| Project Number |
Z13040019 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2013-06-28 13:10:37 | GENERALLY, THE STUDY FALLS SHORT IN WHAT WOULD BE | | | EXPECTED FROM A TYPICAL TRAFFIC IMPACT STUDY. | | | | | | THE STUDY AS SUBMITTED IS UNACCEPTABLE FOR THE | | | FOLLOWING REASONS: | | | | | | THE STUDY DOES NOT PRESENT A SEQUENTIAL ANALYSIS FROM | | | EXISTING TRAFFIC TO FUTURE TRAFFIC WITH POTENTIAL | | | DIVERSIONS | | | THERE ARE NO GRAPHICS SHOWING SITE TRAFFIC AND DIVERTED | | | TRAFFIC | | | TRAFFIC COUNTS WERE TAKEN IN MAY AND NO SEASONAL | | | ADJUSTMENT WAS APPLIED | | | FIGURE 2 APPEARS TO BE MISSING | | | SIGNALIZED INTERSECTION ANALYSIS WAS PERFORMED FOR | | | UNSIGNALIZED INTERSECTIONS | | | | | | IT IS SUGGESTED THAT THE APPLICANT COME IN AND MEET | | | WITH US SO WE CAN DISCUSS THE COMPONENTS OF AN | | | ACCEPTABLE STUDY |
| |
Print |
|