| 2013-05-08 16:07:15 | 1. PROVIDE COPY OF SFWMD ERP OR NO-NOTICE PERMIT PRIOR | | | TO START OF CONSTRUCTION. | | | 2. PROVIDE COPY OF NPDES NOI PERMIT PRIOR TO START OF | | | CONSTRUCTION. | | | 3. PROVIDE DRAINAGE CALCULATIONS, INCLUDING LAND USE | | | BREAKDOWN (PERVIOUS, IMPERVIOUS, BUILDING, ETC), WATER | | | QUALITY TREATMENT, ETC., WITH THE CITY'S ENGINEERING | | | PERMIT APPLICATION. | | | 4. PROVIDE SWPPP PLAN WITH THE CITY'S ENGINEERING | | | PERMIT APPLICATION. | | | 5. INDICATE VERTICAL DATUM ON THE PLANS (SHOULD BE NGVD | | | 1929). | | | 6. INDEPENDENT DRAINAGE SYSTEMS, EACH DESIGNED TO | | | PROVIDE WATER QUALITY TREATMENT FOR THE DRAINAGE AREA | | | TRIBUTARY TO THE SYSTEM AND EACH TO HAVE A CONTROL | | | STRUCTURE, NORTH AND SOUTH OF EUCALYPTUS ST. | | | 7. DRAINAGE SYSTEM ON LOT SOUTH OF EUCALYPTUS ST. | | | INTERCONNECTS DRAINAGE SYSTEMS ON EUCALYPTUS ST. AND | | | 6TH ST. | | | 8. FDOT PERMITS REQUIRED FOR DRAINAGE IMPACTS TO DIXIE | | | HIGHWAY DRAINAGE SYSTEM AND SURFACE CHANGES TO THE 7TH | | | ST/DIXIE HWY INTERSECTION. PROVIDE WITH THE CITY?S | | | ENGINEERING PERMIT APPLICATION. | | | 9. HOW WILL BOTTOM LEVELS OF PARKING GARAGES DRAIN? | | | 10. SHOW WHERE THE EXISTING CATCH BASINS AT 7TH STREET | | | / OLIVE AVE DRAIN TO. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 | | | |
| |
Print |
|