| Plan Review Notes For Project Z13020021 |
| Project Number |
Z13020021 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-03-11 12:42:24 | 1. PROJECT DESCRIPTION DESCRIBED A 6' WALL SURROUNDING | | | THE PROPERTY. SURVEY CALLS OUT EXISTING 8' WALL. | | | 2. CITY CONSIDERS GRAVEL COVERED AREAS AS IMPERVIOUS | | | SURFACE. REVISE THE DRAINAGE CALCULATIONS ACCORDINGLY. | | | 3. LABEL DIMENSIONS OF DETENTION AREA. | | | 4. STORMWATER DETENTION AREA SHOULD BE SODDED. | | | 5. SUGGEST USING STEEPER SIDE SLOPES (UPTO 4:1) FOR | | | DETENTION AREA TO BETTER DEFINE THE STORM WATER | | | DETENTION AREA. | | | 6. LABEL VERTICAL DATUM ON CIVIL PLANS. | | | 7. USE LATEST CWPB DETAILS. | | | 8. REPLACE SIDEWALK AT NEW DRIVEWAY ENTRANCE WITH 6" | | | THICK SLAB. | | | 9. VERIFY STORMATER OUTFALL PIPE IS FUNCTIONAL. | | | 10. PROVIDE SWPPP AND EROSION CONTROL PLAN WITH | | | ENGINEERING PERMIT APPLICATION. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 | | | |
| |
Print |
|