Plan Review Notes
Plan Review Notes For Project Z13010016
Project Number Z13010016
Review Stop STORM
Sequence Number 1
Notes
Date Text
2013-02-11 08:17:281. NO ENGINEERING CALCULATIONS PROVIDED. SIGNED AND
 SEALED CALCULATIONS WILL BE REQUIRED WITH ENGINEERING
 PERMIT APPLICATION SUBMITTAL.
 2. SFWMD ERP PERMIT OR EXEMPTION LETTER TO BE PROVIDED
 BEFORE START OF CONSTRUCTION.
 3. SHEET C-2: REMOVE "COUNTY" IN REFERENCES TO "WEST
 PALM BEACH COUNTY".
 4. SHEET C-3: REMOVE REFERENCE TO BROWARD COUNTY.
 5. NOTIFY ADJACENT PROPERTY OWNER TO NORTH OF
 PAVEMENT/SIGN REMOVAL.
 6. SHEET C-6: ADJUST RIDGE LINE ON SOUTH DRIVEWAY OR
 MODIFY SPOT GRADES.
 7. "FLAT" AREA ALONG NORTH CURB LINE OF SOUTH DRIVEWAY.
 8. VERIFY PROPOSED GRADES WILL PROVIDE MAXIMUM SIDEWALK
 CROSS SLOPE OF 2%.
 9. WHEEL STOPS NOT SHOWN FOR DIAGONAL PARKING.
 10. CONSTRUCTION NOTE 1 - ARE EXISTING STRUCTURES BEING
 USED (AND WITH A BOTTOM ELEVATION OF 2.0' NGVD)?
 11. CONSIDER ROOT BARRIER WHERE TREES ARE WITHIN 5 FEET
 OF EXFILTRATION TRENCH WALL.
 12. CONNECT ROOF DRAINS DIRECTLY INTO ONSITE DRAINAGE
 SYSTEM.
 13. FDOT PERMIT WILL BE REQUIRED FOR WORK IN DIXIE
 HIGHWAY RIGHT-OF-WAY.
  
 TRACY L. WARD, P.E.
 SENIOR STORM WATER ENGINEER
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 561-494-1120
  Print