| Plan Review Notes For Project Z12110023 |
| Project Number |
Z12110023 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-12-10 14:48:30 | 1. CONCEPTUAL CIVIL PLAN AND CONCEPTUAL DEMOLITION PLAN | | | NOT SIGNED AND SEALED. | | | 2. NO DRAINAGE CALCULATIONS PROVIDED. | | | 3. PROVIDE PROPOSED FINISHED FLOOR ELEVATIONS FOR FIRST | | | (GARAGE) AND SECOND FLOORS. | | | 4. PROVIDE DETAILS OF EXFILTRATION TRENCH. | | | 5. SFWMD ERP OR EXEMPTION LETTER REQUIRED BEFORE START | | | OF CONSTRUCTION/DEMOLITION. | | | 6. EROSION CONTROL PLAN AND STORM WATER POLLUTION | | | PREVENTION PLAN REQUIRED WITH ENGINEERING PERMIT | | | APPLICATION. | | | 7. HOW WILL GARAGE DRAIN? | | | 8. NORTH STAIRWELL IN CONFLICT WITH EXISTING POWER POLE | | | AND OVERHEAD WIRES. | | | 9. WITH THE PROPOSED INSTALLATION OF THE TREE GRATES, A | | | SIDEWALK EASEMENT NEEDED ALONG THE WEST SIDE OF | | | BUILDING. | | | 10. DIFFERENT OWNERS LISTED FOR EASTERN-MOST LOT AND | | | THE OTHER FOUR LOTS, NEITHER OF WHICH IS THE APPLICANT. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
| |
Print |
|