| Plan Review Notes For Project Z12110016 |
| Project Number |
Z12110016 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2013-02-11 13:45:37 | 1. EXFILTRATION TRENCH DETAIL WILL BE REQUIRED FOR | | | ENGINEERING PERMIT. | | | 2. DESIGN GRADES AND DRAINAGE SYSTEM DESIGN INFORMATION | | | NOT SHOWN ON PRELIMINARY ENGINEERING PLANS. CANNOT | | | VERIFY EXFILTRATION TRENCH CALCULATION ASSUMPTIONS. | | | 3. STORM WATER POLLUTION PREVENTION PLAN WITH AN | | | EROSION CONTROL PLAN WILL BE REQUIRED WITH THE | | | ENGINEERING PERMIT APPLICATION SUBMITTAL. | | | 4. SFWMD ERP OR EXEMPTION LETTER TO BE PROVIDED BEFORE | | | START OF CONSTRUCTION. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 | | | |
| |