| 2012-12-11 09:00:01 | BUILDING REQUIREMENTS COMMENTS: |
| | - PLEASE MODIFY THE BUILDIGN DATA TO INCLUDE TOTAL SITE |
| | AREA, GROSS BUILDING AREA, AND MECHANICAL AREA. INCLUDE |
| | A GRAPHIC OF EACH FLOOR INDICATING AREAS COUNTED AS |
| | GROSS BUILDING AREA, AND MECHANICAL (SEE DEFINITION IN |
| | SEC 94-109) |
| | - PLEASE CONFIRM COMPLIANCE WITH MAXIMUM BUILDING |
| | FOOTPRINT. |
| | - PLEASE CONFIRM COMPLIANCE WITH FIVE FEET REAR |
| | SETBACK. |
| | - PLEASE CONFIRM COMPLIANCE WITH 20 FEET SIDE SETBACK |
| | ABOVE 5TH STORY. EAST STAIR ENCROACHING INTO SETBACK. |
| | - PLEASE INDICATE ON A GRAPHIC WHICH AREAS ARE BEING |
| | CONTED FOR THE PRIVATE OPEN SPACE, INCLUDE AREAS AND |
| | CONFIRM COMPLIANCE WITH OPEN SPACE REQUIREMENTS |
| | ACOORDING TO TABLE IV-7 AND IV-8. |
| | - SURVEY INDICATES A DIFFERENT LOCATION FOR EXISTING |
| | - OFF SITE PARKING EXIT/ENTRANCE CIRCULATION SHALL BE |
| | STUDY DUE TO POSSIBLE SAFETY CONFLICTS. PLESE PROVIDE A |
| | CIRCULATION AND OPERATION STUDY FOR THE DROP-OFF/VALET |
| | AREA AND PARKING. |
| | - PROPOSED PORTE-COCHERE TYPE "A" DOES NOT COMPLY WITH |
| | THE REQUIRED DIMENSIONS. A DAC VARIANCE WILL BE |
| | NECESSARY DUE TO ITS COMBINATION WITH THE PARKING |
| | ACCESS DRIVE. |
| | - TREE ALTERATION PERMIT SHALL BE MODIFIED ACCORDING TO |
| | NEW LANDSCAPE PLANT. |
| | - OPEN SPACE AREA CANNOT INCLUDE COVERED AREAS. OPEN |
| | SPACE IS DEFINED AS AN IMPROVED OUTDOOR AREA OPEN TO |
| | THE SKY. |
| | - PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE WITH |
| | THE MINIMUM 50% TRANSPARENCY REQUIREMENT ALONG THE 1ST |
| | FLOOR OF HIBISCUS STREET. |
| | - PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE WITH |
| | FACADE ARTICULATION REQUIREMENTS ACCORDING TO TABLE |
| | IV-4. |
| | - PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE WITH |
| | MINIMUM 65% ACTIVE USE REQUIREMENTS. MECHANICAL |
| | ROOMS/STORAGE ROOMS ARE NOT CONSIDERED ACTIVE USE. |
| | - ALL MECHANICAL EQUIPMENT ON ROOFTOP SHALL BE ENCLOSED |
| | AND SCREENED. |
| | - COLOR ELEVATIONS AND RENDERS INDICATING THE BUILDING |
| | SETTING IN ITS CONTEXT ARE NECESSARY FOR THE DAC |
| | SPECIAL REVIEW. |
| | |
| | STREETSCAPE: |
| | - PLEASE CLARIFY THE IMPACT ON THE PEDESTRIAN PATH OF |
| | THE UTILITY CONNECTION (DOMESTRIC METER VAULT) LOCATED |
| | WITHIN THE REQUIRED SETBACK ALONG HIBISCUS ST. |
| | - FURTHER DISCUSSION WILL BE NECESSARY WITH STAFF TO |
| | COORDINATE THE EXACT CONFIGURATION OF THE CURB AND THE |
| | SELECTION FOR PLANT MATERIAL. IT SEEMS PROPOSED PROJECT |
| | IS MOVING THE CURB TOWARDS THE CENTER OF THE ROAD. |
| | |
| | OFF SITE PARKING: |
| | - OFF SITE PARKING WILL REQUIRE DAC APPROVAL |
| | - SURFACE PARKING LOTS REQUIRE A FIVE FEET LANDSCAPE |
| | BUFFER AROUNG THE ENTIRE SURFACE PARKING LOT. |
| | - FIVE FEET TREE ISLANDS ARE REQUIRED EVERY 10 PARKING |
| | SPACES. |
| | - ACCESS SHALL BE PROVIDED THROUGH GARDENIA STREET. |
| | - A TREE ALTERATION PERMIT FOR THE NEW SURFACE PARKING |
| | LOT SHALL BE SUBMITTED. |
| | - DEMOLITION OF EXISTING BUILDING IS NOT PERMITTED |
| | UNDER THE CURRENT DMP REGULATIONS. DAC APPROVAL FOR |
| | DEMOLITION WILL BE NECESSARY. |
| | - SURFACE PARKING LOTS ALONG PRIMARY STREETS ARE NOT |
| | PERMITTED, DIXIE HWAY IS A PRIMARY STREET. |
| | - WHEEL STOPS ARE REQUIRED FOR ALL PARKING SPACES. |
| | |
| | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439. |
| |