| Date |
Text |
| 2012-11-11 16:22:50 | 1. SFWMD ERP PERMIT REQUIRED BEFORE START OF | | | CONSTRUCTION. | | | 2. STORMWATER POLLUTION PREVENTION PLAN TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | 3. NPDES CONSTRUCTION PERMIT REQUIRED BEFORE START OF | | | CONSTRUCTION. | | | 4. SHOW AND LABEL PROPOSED UTILITIES AND EXISTING | | | UTILITIES THAT ARE TO REMAIN AS WELL AS ALL EASEMENTS | | | ON THE LANDSCAPE PLANS. | | | 5 COORDINATE ENGINEERING SITE PLAN, LANDSCAPE PLAN TO | | | MINIMIZE CONFLICTS BETWEEN UTILITIES, TREES AND LIGHT | | | POLES. ROOT BARRIER RECOMMENDED WHEN HORIZONTAL | | | SEPARATION BETWEEN UTILITIES AND TREES ARE LESS THAN | | | FIVE FEET. | | | 6. WILL THE EXISTING SANITARY SEWER SYSTEM CROSSING THE | | | SITE REMAIN? VERIFY TREES ARE ALLOWED WITHIN THE | | | UTILITY EASEMENT OVER THE SANITARY SYSTEM AND WITHIN | | | THE UTILITY EASEMENT ALONG EXECUTIVE CENTER DRIVE. | | | 7. HOW WILL THE STORMWATER RUNOFF FROM THE WIDENED | | | LUMBERTON DRIVE BE MANAGED? | | | 8. VERIFY THE EXISTING INLET ON LUMBERTON DRIVE IS | | | SUFFICIENT FOR THE ROAD. | | | 9. VERIFY THE EXISTING OUTFALL PIPE IS SUFFICENT FOR | | | THIS PROJECT AND LUMBERTON DRIVE. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 | | | |
| |
Print |
|