2012-12-13 14:15:001. PLEASE SEE COMMENTS FROM 11/7/12.
 2. SEPARATE APPLICATION FOR ENGINEERING AND PUBLIC
 WORKS PERMIT REQUIRED.
 3. WATER DISTRIBUTION MAIN AND FIRELINE SHALL BE MASTER
 METERED AND PRIVATELY OWNED.
 4. DEVELOPER SHALL ASSUME OWNERSHIP AND MAINTENANCE OF
 THE EXISTING SANITARY SEWER MAIN.
 5. STORMWATER SYSTEM MUST BE DESIGNED FOR CONTAINMENT.
 (I.E.CONTROL STRUCTURE, DETENTION POND, EXFILTRATION
 TRENCH, ETC.)
  
 BRIAN R. MOREE, MPA, FCHP
 ENGINEERING CONSTRUCTION MANAGER
 CONSTRUCTION ADMINISTRATION
 ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET
 FOURTH FLOOR
 WEST PALM BEACH, FLORIDA 33401
 OFFICE: 561-494-1098
 MOBILE: 561-644-7270
 EMAIL: [email protected]
 WEB: WWW.WPB.ORG/ENGINEERING
  
2012-11-07 09:47:371. SEPARATE APPLICATION FOR ENGINEERING & PUBLIC WORKS
 PERMIT REQUIRED.
 2. SITE CIVIL DRAWINGS ARE REQUIRED FOR COMPREHENSIVE
 INFRASTRUCTURE COMMENTS.
 3. AN ENVIRONMENTAL RESOURCE PERMIT FOR SFWMD WILL BE
 REQUIRED.
 4. AN PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT IS
 REQUIRED IN CONJUNCTION WITH FORMAL SITE DEVELOPMENT
 CIVIL INFRASTRUCTURE REVIEW.
 5. IN CONSIDERATION OF THE PREVIOUS USE OF THE SITE,
 THE CITY MAY REQUIRE ADDITIONAL ENVIRONMENTAL SITE
 ASSESSMENT AND CONTROL, WHICH MAY INCLUDE, BUT NOT BE
 LIMITED TO, ENVIRONMENT SAMPLING AND TESTING,
 DEWATERING CONTROL, CONSTRUCTION STORMAWATER CONVEYANCE
 MANAGEMENT, PARTICULATE ABATEMENT, AND ENVIRONMENTAL
 HAZARD ABATEMENT.
 6. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND
 STORMWATER MANAGEMENT PLAN ARE REQUIRED.
 7. A SANITARY SEWER SYSTEM CAPACITY ENGINEERING
 EVALUATION WILL BE REQUIRED IN CONJUNCTION WITH FORMAL
 SITE DEVELOPMENT CIVIL INFRASTRUCTURE REVIEW.
 8. A WATER DISTRIBUTION SYS EVALUATION WILL BE REQUIRED
 IN CONJUNCTION WITH FORMAL SITE DEVELOPMENT CIVIL
 INFRASTRUCTURE REVIEW.
 9. UTILITY SYSTEM INFRASTRUCTURE IMPROVEMENTS AND/OR
 EXPANSION MAY BE REQUIRED TO SUPPORT THE PROPOSED
 DEVELOPMENT. THIS MAY INCLUDE, BUT IS NOT LIMITED TO,
 WATER DISTRIBUTION SYSTEM IMPROVEMENTS, SANITARY SEWER
 SYSTEM IMPROVEMENTS, AND STORMWATER CONVENIENCE SYSTEM
 IMPROVEMENTS.
 10. HIGHLY RECOMMEND CHANGING SITE LIGHTING FROM HPS TO
 LED.
  
 BRIAN R. MOREE, MPA, FCHP
 ENGINEERING CONSTRUCTION MANAGER
 CONSTRUCTION ADMINISTRATION
 ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET
 FOURTH FLOOR
 WEST PALM BEACH, FLORIDA 33401
 OFFICE: 561-494-1098
 MOBILE: 561-644-7270
 EMAIL: [email protected]
 WEB: WWW.WPB.ORG/ENGINEERING
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved