| Plan Review Notes For Project Z12090008 |
| Project Number |
Z12090008 |
|
| Review Stop |
STORM |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2013-10-04 15:51:21 | 1. SHOW PROPOSED DRAINAGE ON LANDSCAPE PLANS. | | | 2. PORTION OF WALKWAY EAST OF STRUCTURE C1 APPEARS TO | | | BE FLAT (SPOT GRADES = 13.10 AT FOUR CORNERS). | | | 3. PGD NOTE #6 ON SHEET C2 INDICATES ELEVATION DATUM IS | | | NAVD 1988. PER CITY CODE, ELEVATION DATUM TO BE NGVD | | | 1929. ADDING A CONVERSION EQUATION WILL NOT BE | | | ACCEPTABLE. | | | 4. SWPPP PLAN TO BE SUBMITTED WITH THE ENGINEERING | | | PERMIT APPLICATION TO THE CITY. | | | 5. SFWMD ERP PERMIT OR PROOF OF EXEMPTION TO BE | | | PROVIDED TO CITY BEFORE START OF CONSTRUCTION. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 | | | | | | |
| |