| Plan Review Notes For Project Z12080011 |
| Project Number |
Z12080011 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-09-11 08:04:08 | 1. LANDSCAPE PLAN SHOULD SHOW EXISTING DRAINAGE PIPES | | | THAT ARE TO REMAIN, | | | 2. ALL NEW CATCH BASINS ARE NUMBERED NO. 2. | | | 3. PROPOSED CRAPE MYRTLE TREE NEAR NEW CATCH BASIN | | | NORTH OF PROPOSED MENU BOARD. | | | 4. PROPOSED LIVE OAK TREES IN NEW TERMINAL LANDSCAPE | | | ISLAND NORTH OF DRIVE-THRU LANE WILL BE OVER EXISTING | | | 15" CMP DRAINAGE PIPE. | | | 5. PROPOSED CABBAGE PALMETTO TREE IN LANDSCAPE ISLAND | | | TO THE WEST OF SITE WILL BE NEAR EXISTING 18" CMP | | | DRAINAGE PIPE. CONSIDER USING ROOT BARRIER. | | | 6. PROVIDE COPY OF SFWMD ERP MODIFICATION BEFORE START | | | OF CONSTRUCTION/DEMOLITION. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 |
| |
Print |
|