Plan Review Notes
Plan Review Notes For Project Z12070018
Project Number Z12070018
Review Stop ENG - PPRC
Sequence Number 2
Notes
Date Text
2012-11-05 15:39:181. SPECIFIC COMMENTS ARE NOT AVAILABLE UNTIL CIVIL SITE
 DRAWINGS ARE SUBMITTED TO THE ENGINEERING SERVICES &
 PUBLIC WORKS DEPARTMENT FOR FORMAL REVIEW.
 2. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL
 BE REQUIRED PRIOR TO COMMENCEMENT OF SITE WORK.
 3. A RIGHT-OF-WAY PERMIT WILL BE REQUIRED FOR ALL
 PROJECT RELATED WORK IN THE ADJACENT PUBLIC
 RIGHT-OF-WAY.
 4. SOLID WASTE COLLECTION TRAFFIC CIRCULATION IS
 OBSTRUCTED BY THE BUILDING FOR THE EAST PARKING EXIT.
 CURRENT DUMPSTER LOCATION REQUIRES MULTI-POINT TURN FOR
 EXITING. DUMPSTER RELOCATION AND/OR DEDICATED
 TURN-AROUND AREA REQUIRED.
  
 BRIAN R. MOREE, MPA, FCHP
 ENGINEERING CONSTRUCTION MANAGER
 CONSTRUCTION ADMINISTRATION
 ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET
 FOURTH FLOOR
 WEST PALM BEACH, FLORIDA 33401
 OFFICE: 561-494-1098
 MOBILE: 561-644-7270
 EMAIL: [email protected]
 WEB: WWW.WPB.ORG/ENGINEERING
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved