| Plan Review Notes For Project Z12070018 |
| Project Number |
Z12070018 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-08-01 11:22:08 | 8/1/2012 | | | 1. ARCHITECTURAL GROUND FLOOR SITE PLAN, CIVIL SITE | | | PLAN AND LANDSCAPE PLAN DO NOT MATCH: | | | A. SOUTH AND WEST PARKING SPACES DIFFERENT DIMENSIONS | | | B. WHEEL STOPS SHOWN ON ARCHITECTURAL PLAN | | | C. HANDICAP PARKING ACCESS AISLE LOCATION | | | D. SIDEWALK WIDTH ALONG SOUTH SIDE OF WEST BUILDING | | | E. PALM TREES VS. HEDGE ALONG SOUTH PROPERTY LINE. | | | | | | 2. CIVIL SITE PLAN NOT SIGNED AND SEALED. | | | 3. EXISTING / PROPOSED DRAINAGE SYSTEM NOT SHOWN. | | | 4. PROPOSED GRADING PATTERNS NOT PROVIDED. | | | 5. STORMWATER WATER QUALITY TREATMENT VOLUME TO BE | | | PROVIDED ON SITE (MINIMUM OF 1" OF RUNOFF FROM SITE OR | | | 2.5" RUNOFF TIMES PERCENT IMPERVIOUS). | | | 6. SFWMD ENVIRONMENTAL RESOURCES PERMIT WILL BE NEEDED | | | BEFORE START OF CONSTRUCTION. | | | 7. EROSION CONTROL PLAN WILL BE REQUIRED WITH FINAL | | | ENGINEERING PLANS. | | | 8. DRAINAGE CALCULATIONS WILL BE REQUIRED FOR | | | ENGINEERING PERMITS. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | (561) 494-1120 | | | |
| |
Print |
|