| Plan Review Notes For Project Z12060017 |
| Project Number |
Z12060017 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-07-06 17:00:45 | THE TRAFFIC STATEMENT PREPARED BY THE APPLICANT'S | | | ENGINEER STATES THAT THE PROPOSED DEVELOPMENT WILL | | | GENERATE OVER 3,900 DAILY TRIPS, OVER 270 AM AND OVER | | | 340 PM PEAK HOUR TRIPS. THE PROPERTY IS EXEMPT FROM | | | PALM BEACH COUNTY'S TRAFFIC CONCURRENCY REQUIREMENTS. | | | HOWEVER, BASED ON THE MAGNITUDE OF THE PROJECTED TRIP | | | GENERATION, THE APPLICANT SHALL SUBMIT A TRAFFIC IMPACT | | | STUDY TO INCLUDE THE INTERSECTIONS OF HANK AARON DRIVE | | | WITH PALM BEACH LAKES BLVD. AND CONGRESS AVENUE AS WELL | | | AS THE SITE DRIVEWAYS ON HANK AARON DRIVE. THE SITE | | | PLAN SHALL SHOW ROADWAY SIGNING AND STRIPING, E.G., | | | CROSSWALK SIGNS, STOP SIGNS, STOP BARS, LANE LINES, | | | ETC. |
| |
Print |
|