| Plan Review Notes For Project Z12060017 |
| Project Number |
Z12060017 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-07-03 12:01:48 | 1. SIDEWALK EASEMENT WILL BE REQUIRED IN FRONT OF | | | BUILDING NO. 4. | | | 2. UTILITY EASEMENTS WILL BE REQUIRED FOR THE TWO LINES | | | TO THE METER ASSEMBLIES. | | | 3. DISCUSSION WITH PUBLIC UTILITIES AND LAW DEPT. WILL | | | BE NEEDED FOR THE FEASIBILITY OF THE TURQUOISE | | | NECKLACE. | | | 4. PEDESTRIAN CROSSING WILL BE NEEDED ACROSS ENTRANCE | | | FROM EAST SIDE OF HANK AARON TO SOUTH SIDE. | | | |
| |
Print |
|