| Plan Review Notes For Project Z12060017 |
| Project Number |
Z12060017 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-07-10 11:30:22 | 1. COORDINATE DRAINAGE DESIGN WITH PROPOSED FIRE | | | STATION NO. 5 EOC DRAINAGE SYSTEM. | | | 2. CONSTRUCTION EASEMENT MAY BE NEEDED TO WORK ON FIRE | | | STATION NO. 5 SITE. | | | 3. MAINTAIN PROPER CLEARANCE BETWEEN SANITARY SEWER AND | | | DRAINAGE STRUCTURE WEST OF BUILDING 13. | | | 4. PROVIDE BREAK IN EXFILTRATION TRENCH WHERE OTHER | | | UTILITIES CROSS THE STORM PIPES. | | | 5. INDICATE WHERE THE CONTROL WEIRS WILL BE BETWEEN THE | | | EXFILTRATION TRENCHES AND "LAKES". | | | 6. SHEETS 5 AND 6 INCORRECTLY TITLED (W&S DETAILS VS. | | | P&D DETAILS). |
| |