2012-07-18 14:12:461. PROVIDE A DETAIL ON HOW DEAD END EXFILTRATION
 TRENCHES (ATTACHED TO STRUCTURES 1, 8 AND 9) ARE TO BE
 TERMINATED (I.E. END CAP, 4-FT SECTION OF
 NON-PERFORATED PIPE, OPEN END WRAPPED WITH FILTER
 CLOTH, ETC.). WHAT WILL BE THE PIPE SLOPE OR PIPE
 INVERT ELEVATION AT THE DEAD END?
 2. PLEASE INDICATE IF THE OUTFALL PIPES FROM THE TWO
 EXISTING STRUCTURES NEAR STRUCTURES 4 AND 5 WILL
 CONTINUE TO DISCHARGE STORMWATER RUNOFF? IF NOT, WOULD
 YOU CONSIDER REMOVING/ABANDONING THE EXISTING
 STRUCTURES AND OUTFALL PIPES?
  