| Plan Review Notes For Project Z12020014 |
| Project Number |
Z12020014 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-03-06 14:43:18 | 1. PROPOSED TREE ATOP STORM PIPE BETWEEN S-104 AND | | | CS-1. CONSIDER RELOCATING S-104 TO SOUTH. | | | 2. PROVIDE DETAIL OF CS-1. DOES THIS STRUCTURE HAVE A | | | WEIR? | | | 3. CONSIDER RELOCATING EXFILTRATION TRENCH TO BE CLOSER | | | TO CONTROL STRUCTURE. | | | 4. PROVIDE TOPOGRAPHIC SURVEY OF PROPOSED PROJECT SITE | | | SHOWING SPOT GRADES AT PROPOSED PAVEMENT TIE-INS AND 10 | | | FEET OUTSIDE OF PROJECT SITE. THE PROPOSED PROJECT | | | ENCOMPASSES MORE THAN LOT 1 OF "PERINI-WESTWARD | | | COMMERICAL AREA" PLAT (PB28, PAGE 170). | | | 5. CONFIRM BACK OF SIDEWALK GRADES OF 20.10 AND 19.70 | | | AT OKEECHOBEE DRIVEWAY ENTRANCE. | | | 6. SFWMD PERMIT TO BE PROVIDED. | | | 7. STORMWATER POLLUTION PREVENTION PLAN TO BE PROVIDED | | | AT TIME OF DEMOLITION PERMIT AND BUILDING PERMIT. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEERING | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | | | | |
| |
Print |
|