| Notes |
| Date |
Text |
| 2012-06-13 10:38:51 | ACCESS CAN BE ACHIEVED DIRECTLY FROM DIXIE HIGHWAY, IN | | | THE DIRECTION OF TRAFFIC FLOW ON DIXIE HIGHWAY, BY | | | ANGLING THE DRIVEWAY SO AS NOT TO ENTER FROM THE ALLEY. | | | ENTERING FROM THE PROPOSED SOUTHERN HOTEL DRIVEWAY | | | WOULD REQUIRE A 180 DEGREE TURN WHICH COULD PRESENT | | | OPERATIONAL AND SAFETY ISSUES. ALL VALET EGRESS FROM | | | THE CITY CENTER GARAGE SHOULD BE FROM BANYAN BOULEVARD. | | | THIS WILL MINIMIZE CONFLICTS WITH THE ENTRANCE/EXIT OF | | | THE CITY CENTER GARAGE ON DIXIE HIGHWAY. |
| |