Plan Review Notes
Plan Review Notes For Project Z11070007
Project Number Z11070007
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2011-09-13 14:39:431. INCOMPLETE SITE CIVIL DRAWINGS. TO EFFECTIVELY
 PROVIDE COMMENT IN REFERENCE TO ANY PROPOSED
 CONSTRUCTION IN THE RIGHT-OF-WAY (ALLEY), ENGINEERING
 SERVICE MUST RECEIVE A COMPLETE PLAN SET REPRESENTING
 THE ALL PROPOSED CONSTRUCTION WITH SUPPORTING TECHNICAL
 SPECIFICATIONS AND DETAILS.
 2. UTILITY SERVICE DEMAND CALCULATIONS ARE NOT
 CONTAINED WITHIN THE PLANS. WILL THE PROJECT UTILITY
 SERVICE DEMAND FOR WATER AND SANITARY DIFFER FROM
 PREVIOUS USE?
 3. STORMWATER CALCULATIONS ARE REQUIRED FOR ONSITE
 MODIFICATIONS. THIS SHALL INCLUDE BOTH A STORMWATER
 POLLUTION PREVENTION PLAN (SWPPP) DETAILING HOW SOIL
 AND DEBRIS WILL BE CONTAINED ON SITE DURING
 CONSTRUCTION ACTIVITY AND A MASTER STORMWATER
 MANAGEMENT PLAN FOR POST-CONSTRUCTION.
  
 FOR FURTHER INFORMATION, PLEASE CONTACT ENGINEERING
 SERVICES.
  
 BRIAN R. MOREE
 CONSTRUCTION MANAGER
 ENGINEERING SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-494-1098 OFFICE
 561-644-7270 MOBILE
 [email protected]
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved