| 2010-03-30 12:11:52 | ON 3/16/10 I INSPECTED THE STORE UNDER THE CONVENIENCE |
| | STORE ORDINANCE 3980-06. THE STORE IS IN THE MIDDLE OF |
| | REMODELING. BELOW ARE THE AREAS THAT I WAS UNABLE TO |
| | INSPECT: |
| | |
| | * I WAS UNABLE TO INSPECT THE CAMERA SECURITY SYSTEM TO |
| | SEE IF IT IS FUNCTIONING, THE UNIT MUST BE ABLE TO |
| | PRINT A CLEAR IMAGE UPON REQUEST, NO MAINTANCE LOG KEPT |
| | * THE PARKING LOT ILLUMINATION |
| | * NO CASH MANAGEMENT POLICY ON SITE |
| | * NO ROBBERY PREVENTION TRAINING HAS BEEN PROVIDED TO |
| | EMPLOYEES |
| | * UNABLE TO TRIGGER SILENT ALARM |
| | |
| | I SPOKE WITH MANAGER AND ADVISED THAT I WILL DROP OFF A |
| | TRAINING MANUEL FOR THEM TO FOLLOW FOR THE TRAINING AND |
| | POLICY. |
| | |
| | THE PROPERTY HAS OVERGROWTH THAT SHOULD BE CLEANED OUT |
| | AND MAINTAINED |
| | |
| 2010-03-29 13:34:33 | |
| | |
| | EFFLUENT GUIDELINES ARE NATIONAL STANDARDS COMPOSED BY |
| | THE EPA, THAT PROVIDE GUIDANCE FOR WASTEWATER |
| | DISCHARGES TO SURFACE WATERS. CONSTRUCTION ACTIVITIES |
| | THAT SIGNIFICANTLY DISTURB THE LAND, SUCH AS CLEARING, |
| | EXCAVATING AND GRADING ARE KNOWN TO HAVE AN IMPACT ON |
| | MANY BIOLOGICAL FACTORS IN THE SURROUNDING ENVIRONMENT, |
| | AND THESE NEW GUIDELINES ARE SET TO TARGET WATER |
| | QUALITY DEGRADATION. |
| | |
| | AS OF FEB 1ST, 2010, CERTAIN SITE OWNERS AND OPERATORS |
| | ARE NOW REQUIRED TO ESTABLISH BEST MANAGEMENT PRACTICES |
| | (BMP'S) TO SAMPLE STORMWATER DISCHARGES AND COMPLY WITH |
| | A NUMERIC SAMPLE FOR POLLUTANT TURBIDITY. POLLUTION |
| | PREVENTION MEASURES WILL ALSO BE REQUIRED TO CONTROL |
| | SITE DISCHARGES, SUCH AS DEWATERING AND CONCRETE |
| | WASHOUT, AND STRICT NEW MEASURES TO PROMOTE SOIL |
| | STABILIZATION HAVE BEEN PLACED IN EFFECT. |
| | |
| | UPGRADES TO THE STATION WILL TRIGGER SURFACE WATER |
| | QUALITY CALCULATIONS AND WATER QUALITY INLETS. |
| | PLEASE PROVIDE PRELIMINARY STORWATER CALCULATIONS THAT |
| | SHOW THAT THE SITE WILL BE ABLE TO PROVIDE ADEQUATE |
| | TREATMENT OF RUNOFF PRIOR TO DISCHARGE. |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | |
| |