| Plan Review Notes For Project Z09090019 |
| Project Number |
Z09090019 |
|
| Review Stop |
L |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2009-10-15 16:55:46 | ***LANDSCAPE REVIEW FAILED*** | | | | | | PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN WRITTEN | | | FORMAT. | | | | | | 1. UPON VISITING THE SITE, WE FOUND SIGNS THAT AT LEAST | | | TWO OR THREE SHADE TREES HAD BEEN REMOVED IN THE AREA | | | OF RECONSTRUCTION. THE APPLICANT SHALL PROVIDE A | | | GROUPING OF THREE QUEEN PALMS (8-10 FEET IN HEIGHT) | | | WITH UNDERPLANTING TO COMPLIMENT WHAT WAS PLANTED IN | | | THE LANDSCAPE ISLAND ON THE OTHER SIDE OF THE STREET. | | | AT LEAST ONE 12 FOOT LIVE OAK SHALL ALSO BE INSTALLED. | | | PLEASE SHOW THIS ON THE LANDSCAPE PLAN. | | | | | | 2. THE LANDSCAPE PLAN SHALL BE SIGNED AND SEALED BY A | | | REGISTERED LANDSCAPE ARCHITECT. | | | | | | 3. WHEN APPLYING FOR THE LANDSCAPE PERMIT, PROVIDE A | | | CERTIFIED COST ESTIMATE THAT INCLUDES THE TOTAL COST OF | | | ALL LANDSCAPE MATERIALS AND LABOR, BROKEN DOWN INTO | | | UNIT COST. | | | | | | 4. THE IRRIGATION SYSTEM WILL NEED TO BE MODIFIED WHICH | | | WILL REQUIRE A PERMIT. THE IRRIGATION SYSTEM SHALL HAVE | | | A RAIN SENSOR DEVICE. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT | | | KUSSNER @ (561) 822-1462. |
| |
Print |
|