| Plan Review Notes For Project Z09090011 |
| Project Number |
Z09090011 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2009-09-30 09:36:24 | 1. MAY NEED TO CHECK WITH FPL FOR PROPOSED DUMPSTER IN | | | THEIR EASEMENT. | | | 2. EXISTING DRAINAGE SHOWN ON CONCEPTUAL ENGINEERING | | | PLANS IS ONLY PROPOSED PER SURVEY AND SITE VISIT. | | | 3. UNITY OF TITLE WILL BE REQUIRED. APPLICATION CAN BE | | | MADE THROUGH ENGINEERING SERVICES. |
| |
Print |
|