| Plan Review Notes For Project Z09080005 |
| Project Number |
Z09080005 |
|
| Review Stop |
ENG-P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2009-08-28 16:31:11 | NO FLOOR DRAIN TO THE SANITARY SEWER CAN BE INSTALLED | | | IN THE DUMPSTER ENCLOSURE, UNLESS IT IS ROOFED SO NO | | | RAIN WATER WILL GET INTO THE DRAIN. | | | | | | ARTICLE II. SOLID WASTE COLLECTION AND DISPOSAL | | | SEC. 74-34. PREPARATION AND STORAGE OF SOLID WASTE FOR | | | COLLECTION. | | | (2) COMMERCIAL. | | | C. COMMERCIAL GARBAGE AND REFUSE SHALL BE DRAINED OF | | | ALL LIQUID BEFORE BEING PLACED FOR COLLECTION. | | | | | | IF A ROOF IS TO BE ADDED TO THE DUMPSTER ENCLOSURE, IT | | | WILL ALTER THE SERVICE AREA LOCATION, SINCE 26 FEET OF | | | UNOBSTRUCTED VERTICAL CLEARANCE IS REQUIRED FOR | | | SANITATION TRUCK'S FRONT/TOP LOADING OPERATION. |
| |
Print |
|