2023-04-26 14:30:17E23030010 ??? COX SCIENCE CENTER FIRST REVIEW 3.16.23
  
 COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 4. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 5. PLEASE LABEL ALL WATER, SEWER AND STORM
 INFRASTRUCTURE AS EXISTING AND PROPOSED.
 6. PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, GREASE TRAPS, ETC. INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, POTABLE AND
 IRRIGATION METERS, BACKFLOWS, FIRE HYDRANTS AND FDCS,
 AND OTHER DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. GATE
 VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR SIDEWALK.
 ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE
 VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON
 PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. PLEASE
 SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPES SIZES AND
 MATERIALS, LOCATED ON THE RIGHT-OF-WAY.
 7. PLEASE CUT AND CAP UTILITIES NOT IN USE AND REMOVE
 ANY ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM
 CITY RIGHT OF WAY.
 8. PLEASE SHOW EXISTING AND PROPOSED UTILITY EASEMENTS,
 INCLUDING THOSE PROPOSED TO ALLOW ACCESS FOR CITY
 PERSONNEL TO PROPOSED UTILITY WATER METERS.
 9. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION, AND
 EXISTING METER AND BACKFLOW (TO BE REMOVED?). 3 INCH
 AND LARGER WATER METERS SHALL BE INSTALLED ABOVE-GROUND
 ONLY.
 10. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA
 AND FIRE BACKFLOW PREVENTER AS DCDA. SPECIFY LEAD FREE
 DESIGN ON ALL BACKFLOWS.
 11. ENGINEERING PLANS SHALL INCLUDE PIGGING, FLUSHING
 AND SAMPLE POINTS ON ANY WATER RUNS 60 FT. IN LENGTH OR
 GREATER.
 12. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 13. PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES AT ALL UTILITY CROSSINGS PER CITY OF
 WEST PALM BEACH STANDARD DETAIL GN-2 SERIES. PLEASE
 SHOW ALL EXISTING AND PROPOSED UNDERGROUND UTILITY
 LAYOUT, INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND
 CABLEVISION & TELECOMMUNICATION FACILITIES WITH PIPE
 MATERIAL AND SIZE, LOCATED ON THE RIGHT-OF-WAY.
 14. WHEN SUBMITTING APPROVED MATERIALS LIST, PLEASE
 PROVIDE MATERIAL/CUT SHEETS FOR ALL PROPOSED BACKFLOW
 DEVICES SHOWING SPECIFIC MODEL NUMBER AND SPECIFYING
 USC APPROVED LEAD-FREE DESIGN.
 15. IF TRENCHING IN IN CITY-MAINTAINED ROADWAY AREAS
 ADD NOTE TO PROVIDE 50 FT. PAVEMENT RESTORATION
 TRANSITION ON EACH SIDE OF PROPOSED TRENCH PER CITY OF
 WPB STANDARD DETAIL GC-4.
 16. PLEASE PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 17. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (E-XXXXXXXX).
 ???
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
  
 -PROVIDE PROPOSED DAYS AND TIMES THAT GATES WOULD BE
 CLOSED/LOCKED AND PREVENT ACCESS BY UTILITY CREWS FOR
 METER READING AND MAINTENANCE ACTIVITIES. ALSO INDICATE
 HOW GATES OPEN (KEYPAD, CARD, PADLOCK, ETC???).
  
 -DEVELOPER/APPLICANT/CUSTOMER TO PAY FOR ALL UTILITY
 BILLING FEES, CHARGES, DEPOSITS RELATED TO PROPOSED
 PROJECT PLANS.
  
 -ON LABELS OF PROPOSED WATER METERS AND BACKFLOW
 ASSEMBLIES, ADD REFERENCE TO THE ASSOCIATED WATER
 SERVICE STANDARD DETAIL.
  
 -WPB UTILITIES RECOMMENDS PARALLEL/DUAL DOMESTIC
 BACKFLOW ASSEMBLIES ON ANY CRITICAL WATER SERVICE TO
 MINIMIZE WATER OUTAGES DURING BACKFLOW ASSEMBLY
 MAINTENANCE AND TESTING.
  
 -SHOW THE NORTHERN ROAD GATE AS DEPICTED ON THE SITE
 PLANS IF THAT AREA IS SHOWN ON ONE OF THE ENGINEERING
 PLAN SHEETS.
  
 -SHEET 17:
  
 *CALLOUTS NEAR SOUTHWEST WATER TAP DO NOT SEEM TO MAKE
 SENSE. SIZING SEEMS CONTRADICTORY. PLEASE REVIEW AND
 CORRECT.
  
 *1 INCH METER TYPICALLY HAS 1 INCH WATER SERVICE PIPE
 AND TAP PER WS1.
  
 *VERIFY PRIVATE FIRE SYSTEM WILL NOT CONTAIN ANY
 CHEMICAL ADDITIVES OR AUXILIARY WATER SOURCES SUCH AS
 WELLS.
  
 *ADD FLOW CALCULATIONS TO SHEET 17 AS DIRECTED IN NOTE
 9 OF WPB STANDARD DETAIL WS5.
  
 *ADD WATER AND SEWER DEMAND CALCULATIONS TO SHEET 17.
  
 *CALLOUT WATER SERVICE PIPE MATERIAL TYPE FOR PROPOSED
 1 INCH WATER METER.
  
 -SHEET 18:
  
 *THERE IS A GATE SHOWING NEAR NORTHWEST CORNER THAT WAS
 PRIOR TOLD WAS INACCURATE AND SHOULD NOT BE THERE.
 PLEASE VERIFY AND UPDATE AS NEEDED.
  
 *CALLOUT WATER SERVICE PIPE MATERIAL TYPE AND
 CONNECTION TYPE FOR PROPOSED 2 INCH WATER METER.
  
 *CALLOUT EXISTING WATER SERVICE PIPE SIZE AND METER
 SIZE FOR STEM BUILDING.
  
 *ADD WATER AND SEWER DEMAND CALCULATIONS TO SHEET 18.
  
 *ADD FLOW CALCULATIONS TO SHEET 18 AS DIRECTED IN NOTE
 9 OF WPB STANDARD DETAIL WS5.
  
 *THERE IS A CROSSING OF TEL AND WATER GATE VALVE. IF
 TEL IS UNDERGROUND, GATE VALVE WOULD HAVE TO BE ABOVE
 IT TO FUNCTION.
  
 *VERIFY PRIVATE FIRE SYSTEM WILL NOT CONTAIN ANY
 CHEMICAL ADDITIVES OR AUXILIARY WATER SOURCES SUCH AS
 WELLS.
  
 *VERIFY SIGN IS NOT ENCROACHING ON FIRE HYDRANT
 CLEARANCE ZONE/AREA AS SHOWN ON THE FIRE HYDRANT
 STANDARD DETAIL.
  
 *THERE IS A CALLOUT TO INSTALL NEW RPPA IF REQUIRED.
 CURRENT BACKFLOW ASSEMBLY IS NOT LEAD-FREE COMPLIANT
 AND WILL HAVE TO BE REPLACED WITH NEW LEAD-FREE,
 USC-APPROVED RP BACKFLOW ASSEMBLY IF RELOCATED. ALSO
 SPECIFY SIZE AS WILL HAVE TO BE LISTED BY SIZE ON AML
 SUBMISSION.
  
 -SHEET 19:
  
 *VERIFY PRIVATE FIRE SYSTEM WILL NOT CONTAIN ANY
 CHEMICAL ADDITIVES OR AUXILIARY WATER SOURCES SUCH AS
 WELLS.
  
 *ADD FLOW CALCULATIONS TO SHEET 19 AS DIRECTED IN NOTE
 9 OF WPB STANDARD DETAIL WS5.
  
 *FOR PROPOSED 3 INCH RPPA, ADD FLOW CALCULATIONS AS
 DIRECTED IN NOTE 7 WPB STANDARD DETAIL WS7.
  
 *FOR PROPOSED 3 INCH WATER METER, ADD WORDING
 ???ABOVE-GROUND??? TO LABEL. IT SHOULD BE INSTALLED PER
 WPB STANDARD DETAIL WS3. THE LARGER WATER METERS AND
 BACKFLOW ASSEMBLIES CAN HAVE A LARGE FOOTPRINT.
 RECOMMEND ALLOWING PLENTY OF SPACE FOR THE BUILDOUT AND
 ALSO FOR ANY ADDED SCREENING BUSHES.
  
 *CALLOUT PIPE SIZE AND MATERIAL TYPE BETWEEN TEE AND
 FIRELINE POINT OF SERVICE GATE VALVE.
  
 *VERIFY 5/8??? SIZE PLUMBING PIPE. NOT SURE IF THAT
 SIZE COMMERCIALLY AVAILABLE.
  
 *5/8??? WATER METERS TYPICALLY HAVE 1 INCH TAP AND 1
 INCH SERVICE LINE SIZE PER WS1 IF DISTANCE BETWEEN TAP
 AND METER IS UNDER 50 FEET.
  
 *CITY DOES NOT ALLOW PVC WATER SERVICES. REFER TO WPB
 STANDARD DETAILS AND AML FOR APPROVED MATERIAL.
  
 *CALLOUT HATCHED AREA NEAR 4 INCH TAPPED PLUG OR ADD TO
 A LEGEND.
  
 *THERE IS A CROSSING CALLOUT LISTING 9 INCH PVC. PLEASE
 VERIFY SIZE.
  
 *ADD NOTE THAT CONTRACTOR SUPPLIES AND INSTALLS BADGER
 METER STRAINER FOR LARGE METERED WATER SERVICE.
  
 -SHEET 20:
  
 *FOR PROPOSED BATHROOM METERED WATER SERVICE, EOR SAID
 WOULD ENGINEER BASED ON ASSUMPTIONS OF USAGE. ADD
 ASSUMPTIONS ON PLAN SHEET 20.
  
 -SHEET 3:
  
 *THERE IS CALLOUT FOR WATER METER SLIGHTLY SOUTHEAST OF
 EXISTING LIFT STATION. INSIDE THE UTILITY BOX THERE IS
 NO WATER METER.
  
 *THERE IS A CALLOUT FOR EXISTING BACKFLOW TO BE REMOVED
 IN LANDSCAPE ISLAND NORTHWEST OF EXISTING BUILDING.
 ADJACENT TO BACKFLOW IS A 1 INCH WATER METER AND BOX.
 IT IS FOR UTILITY ACCOUNT # 3918764610.
  
 *ADD NOTE FOR CONTRACTOR TO RETURN ANY REMOVED WATER
 METERS (INCLUDING FIRELINE DETECTOR METERS) TO CITY
 WPB.
  
 *THERE IS AN EXISTING 1.5 INCH METER (ACCOUNT #
 7391158643) AT NORTH SIDE OF MINI GOLF AREA THAT HAS
 CALLOUT FOR REMOVE AND REPLACE. APPROX. HOW MANY FEET
 AWAY FROM THE 1.5 METER LOCATION WILL THE PROPOSED 2
 INCH METER ON SHEET 18 BE?
  
 *THE EXISTING WATER METER SIZE FOR THE STEM BUILDING
 NEAR NORTH SIDE OF PROPERTY IS ?? INCH (ACCOUNT #
 0598894091)
  
 *ADD THE PIPE SIZE AND MATERIAL TYPE OF WATER MAINS OR
 WATER SERVICES LABELED FOR REMOVAL.
  
 *EXISTING WATER METER AT SOUTH SIDE OF NORTHERN PARKING
 LOT IS 2 INCH SIZE. (ACCOUNT # 0922564610)
  
 -SHEET 26:
  
 *ADD MARKUP NOTE ON WS1 THAT DUAL CHECK IS NOT USED
 WHEN A BACKFLOW ASSEMBLY IS BEING INSTALLED.
  
 *ADD WPB STANDARD DETAIL WS6 TO SHEET.
  
 -CONFLICT BETWEEN UTILITIES AND TREE NEAR PROPOSED 3
 INCH METER. COMPARE SHEETS LP10 AND ENGINEERING PLAN
 SHEET 19. IN RESUBMITTAL PACKAGE, PROVIDE REVISED
 LANDSCAPING PLAN SHOWING UPDATED UTILITY LOCATIONS AND
 ENSURE THAT THERE ARE NO CONFLICTS BETWEEN TREES,
 BUSHES, AND UTILITIES.
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
  
 DRAINAGE CALCULATIONS
 1. EXPLAIN HOW THE SOIL STORAGE DEPTHS (1.88???,
 6.08???, 1.17???) WERE DETERMINED.
 2. PROVIDE EXISTING AND PROPOSED LAND USE MAPS
 SHOWING/OUTLINING THE DIFFERENT LAND USES LISTED IN THE
 CALCULATIONS INCLUDING THE TWO DIFFERENT EXISTING
 PERVIOUS AREAS AND TWO DIFFERENT PROPOSED IMPERVIOUS
 AREAS.
 3. PROPOSED LAKE SURFACE AREA OF 1.01 ACRES IN THE
 DRAINAGE CALCULATIONS CONFLICTS WITH THE 0.92 ACRES OF
 EXPANDED POND LISTED ON THE MASTER PLAN, SHEET 7 OF 27.
 4. EXPLAIN THE PURPOSE OF THE EXFILTRATION TRENCH.
 GIVEN THE LOW EXFILTRATION RATE OF 6.5 X 10-6 AND 75%
 OF THE TRENCH BELOW THE WATER TABLE, IT WOULD SEEM MORE
 ECONOMICAL TO EXPAND THE LAKE TO OBTAIN THE SAME
 STORAGE VOLUME (0.03 AC- FT OR ~1310 C.F.) THAT IS
 PROVIDED BY THE 648 LF OF 8 FT WIDE EXFILTRATION
 TRENCH.
 5. DOES THE PROPOSED SITE STORAGE CALCULATIONS TAKE
 INTO ACCOUNT THE FILL FOR THE PARK???S RESTROOM?
 6. PROVIDE THE SFWMD ERP MODIFICATION WHEN IT IS
 ISSUED.
  
 PLANS
 1. ON EACH SHEET LABEL THE BOUNDARY LINES LISTED WITH
 BEARINGS AND DISTANCES. DO THEY IDENTIFY THE LEASE
 BOUNDARY?
 2. ALL REFERENCES TO PROPERTY LINES SHOULD BE LABELED
 PROPERTY LEASE LINES IF APPLICABLE.
 3. EXPLAIN THE LIMITS OF CONSTRUCTION LINE SHOWN ON
 SHEET 7 OF 27. THERE APPEARS TO BE IMPROVEMENTS SHOWN
 ON BOTH SIDES OF THE LINE.
 4. REVIEW PREVIOUS SFWMD ERP PERMITS FOR DREHER PARK
 FOR DESIGN STORM PEAK STAGES. STRUCTURE A18 NEAR THE
 RELOCATED PLAY STRUCTURES AREA MAY FLOOD DURING THE
 3-YEAR 1-DAY STORM.
 5. LABEL THE DASHED LINE (LIMITS OF CONSTRUCTION?)
 WITHIN THE INTERIOR OF SHEETS 8 ??? 12 AND SHEETS 17
 ??? 21. CHOOSE A DIFFERENT LINE TYPE FROM ONE USED FOR
 THE SHEET MATCHLINES.
 6. PROVIDE PHASING PLANS FOR DEMOLITION AND
 CONSTRUCTION.
 7. NUMBER THE REPLACEMENT DRAINAGE STRUCTURE SOUTH OF
 STRUCTURE C1 ON SHEET 9.
 8. HOW DOES THE LOADING DOCK DRAIN?
 9. HOW IS THE EXFILTRATION TRENCH BETWEEN C3 AND C1
 SURCHARGED TO THE TOP OF THE TRENCH? IS THERE AN
 EXISTING WEIR IN THE EXISTING CATCH BASIN?
 10. EXFILTRATION TRENCH DETAIL ON SHEET 13 LISTS
 SLOTTED RCP PIPE BUT DRAINAGE PLANS CALL OUT HDPE PIPE.
 11. PROVIDE THE PIPE INVERT ELEVATION ON THE
 EXFILTRATION TRENCH DETAIL.
 12. PROVIDE THE VERTICAL DATUM REFERENCE AND CONVERSION
 EQUATION TO NGVD1929 ON SHEETS 13, 15 AND 22.
 13. PROVIDE A PRB DETAIL AND INCLUDE ON EVERY STRUCTURE
 CONNECTED TO EXFILTRATION TRENCH AND IN THE LAST
 STRUCTURE BEFORE DISCHARGE INTO THE LAKE SYSTEM TO KEEP
 FLOATABLES OUT OF THE LAKE. THE 12??? SUMP SHOWN ON THE
 FILTER FABRIC END CLOSURE DETAIL WILL NEED TO BE
 INCREASED.
 14. REVISE TYPICAL PARKING SPACES STRIPING DETAIL ON
 SHEET 13 TO MATCH CITY CODE SECTION 94-485. (PARALLEL
 STRIPES SEPARATED BY 12 INCHES INSTEAD OF 2 INCHES AND
 THE ENDS OF THE STRIPES ARE CONNECTED WITH A 4-INCH
 STRIPE).
 15. EXPLAIN THE 6??? AND 8??? DIMENSIONS ON THE LEFT
 SIDE OF THE RAISED SIDEWALK DETAIL ON SHEET 14.
 16. PROVIDE THE CONVERSION EQUATION TO NGVD1929 ON
 SHEET 14.
 17. TYPICAL SECTIONS F-F AND J-J: CONFIRM RETAINING
 WALL HEIGHT. MODIFY NOTE ON SHEET 9 IF MAX. WALL HEIGHT
 CHANGES.
 18. TWO TYPICAL SECTION F-F SHOWN ON SHEET 15.
 19. IDENTIFY WHERE TYPICAL SECTION P-P DETAIL FOR THE
 LAKE BANK IS SHOWN.
 20. PROVIDE A CROSS SECTION THROUGH THE REFLECTION POOL
 FROM THE DOORS OF BUILDING 1 TO NEAR STRUCTURE A3. SHOW
 SURFACE FEATURES, GRADES, GENERAL SLOPES, ETC.
 21. SHOW TURBIDITY FLOATING BARRIERS AROUND THE OUTFALL
 TO THE EXISTING RETENTION POND AND AROUND THE OUTFALL
 NORTH OF THE PROPOSED BATHROOM FACILITY.
 22. SHEET 23 LIFT STATION PLAN:
 A. LIST VERTICAL DATUM AND CONVERSION EQUATION TO
 NGVD1929.
 B. REVIEW THE FLOOD ELEVATIONS IN THE MOPS PUMP STATION
 SCHEDULE
 C. PROVIDE MINIMUM ELEVATION FOR THE ELECTRICAL PANEL
 (BFE PLUS TWO FEET) SEE NOTE 8 IN THE MOPS PUMP STATION
 COMPLIANCE NOTES SECTION.
 D. WHO IS PROVIDING THE FLOATATION CALCULATIONS AND
 SIZING THE CONCRETE RING AROUND THE WETWELL.
  
 COMMENTS FROM RICKY ELIZONDO, PUB. UTILITIES PLANS
 EXAMINER, [email protected] , 561-494-1101:
 -SHOW ALL EXISTING VALVES AND APPURTENANCES WITHIN
 PROJECT LIMITS FOR BOTH WATER AND SEWER
 -SHOW ALL EXISTING AND PROPOSED DRY UTILITIES
 -PRINT SHEETS SO THAT THEY ARE TO SCALE ON 11X17
 -CONDITION OF EXISTING 8??? CAS WM UNKNOWN, MAY REQUIRE
 REPLACEMENT UPON EVALUATION/ASSESSMENT
 -SEPARATE TAPS FOR DOMESTIC, FIRE, IRRIGATION REQUIRED
 PER DETAIL WS-1
 -PROVIDE PROFILES FOR WATER MAIN TO BE MAINTAINED BY
 WPB
 -DENOTE POINTS OF SERVICE FOR BOTH WATER AND SEWER
 -ANCHOR TEE REQUIRED FOR FIRE HYDRANTS PER DETAIL P-8
 -DENOTE MEANS OF CONNECTION FOR 8??? EXTENSION (LINE
 STOP, INSERTION VALVE, ETC.)
 -CONDITION OF EXISTING VCP SEWER MAIN NEEDS TO BE
 CONSIDERED FOR DOGHOUSE MH
 -EXISTING SEWER INCORRECTLY LISTED AS PVC ON UTILITY
 SHEETS
 -COULD EXISTING WATER SERVICE BE RELOCATED TO AVOID
 CONFLICTS WITH EXISTING DRY UTILITIES?
 -DENOTE ALL WATER AND SEWER NOT TO BE MAINTAINED BY WPB
 AS ???PRIVATE??? AS REQUIRED
 -REFER TO DETAIL P-6 FOR PIGGING/FLUSHING, JUMPER
 ASSEMBLY AND SAMPLE POINT INSTALLATION
 -CALL OUT ALL PROPOSED FITTINGS, VALVES, CLEANOUTS,
 ETC. FOR BOTH WATER AND SEWER
 -ADD DIMENSION BETWEEN PROPOSED FORCE MAIN AND WATER
 MAIN
 -SANITARY LISTED AS ???9??? INCHES ON PROPOSED CROSSING
 OVER FORCE MAIN
 -CUT AND CAP ALL EXISTING SERVICES/LATERALS THAT ARE
 NOT TO BE USED
  