| Date |
Text |
| 2023-06-09 15:53:00 | E23010020 - SUNVIEW MEDICAL CENTER - 1041 45TH ST. |
| | RESUB 4.24.23 |
| | |
| | NO COMMENTS FROM LINDA QUI??ONES-CINTRON, PROJECT |
| | COORDINATOR, ENGINEERING SERVICES DEPT., 561-494-1085 |
| | [email protected] : |
| | |
| | |
| | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE |
| | SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR |
| | [email protected]: |
| | |
| | -PEAK WATER DEMAND WAS LISTED AT 143GPM. 2??? BADGER |
| | M170 METER WOULD BE USED FOR THIS APPLICATION, AND IT |
| | CANNOT BE USED IF FLOW WILL EXCEED 100GPM FOR 60 |
| | MINUTES. PLEASE VERIFY FLOW WILL NOT EXCEED 100GPM FOR |
| | 60 MINUTES AT ANY TIME. |
| | |
| | -POLY PIPE CANNOT BE USED BETWEEN METER AND BACKFLOW |
| | ASSEMBLY. CONSIDER REVISING LABEL FOR PIPING TO COMPLY |
| | WITH DETAIL WS1 AND WS6. (THOSE SHOW THE NECESSARY PIPE |
| | MATERIAL, REQUIRED DEPTH, AND REQUIRED SLEEVING) |
| | |
| | -DEMOLITION PLANS LABEL EXISTING WATER METER AS 2???, |
| | BUT IT IS CURRENTLY 3??? SIZE. |
| | |
| | NO COMMENTS FROM TRACY WARD, SR. STORMWATER ENG., |
| | ENGINEERING SERVICES, [email protected] 561-494-1120: |
| | NO COMMENTS IN PREVIOUS SUBMITTAL |
| | |
| | COMMENTS FROM RICKY ELIZONDO, PUB. UTILITIES PLANS |
| | EXAMINER, [email protected] , 561-494-1101: |
| | -CITY RECORDS SHOW EXISTENCE OF SECOND WATER SERVICE |
| | CONNECTION FOR THIS PROPERTY. PLEASE VERIFY AND |
| | ELABORATE ON WHAT IS TO HAPPEN TO THIS SERVICE. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | |
| |
Print |