| 2022-12-16 12:13:22 | E22100031 - FPL KRAKEN SUBSTATION, 11.17.22 RESUB |
| | |
| | NO COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, |
| | ENGINEERING SERVICES DEPT., 561-494-1098 |
| | [email protected] : |
| | |
| | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE |
| | SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR |
| | [email protected]: |
| | |
| | -WASTEWATER PUMPED FROM FPL STATION TO CITY WPB |
| | INFRASTRUCTURE WOULD NEED TO BE METERED FOR BILLING |
| | PURPOSES. SHOW AND DETAIL ON PLANS. |
| | |
| | -A METER ADDED TO WASTEWATER LINE WOULD TYPICALLY BE |
| | BADGER M5000 MAKE/MODEL. IT SHOULD NOT BE LOCATED IN |
| | ROADS OR DRIVEWAYS AND PIPE DESIGN SHOULD COMPLY WITH |
| | MANUFACTURER???S MANUAL. WOULD REQUEST IT TO BE |
| | INSTALLED ABOVE-GROUND WITH SEVERAL ISOLATION VALVES |
| | |
| | -METER INSTALLATION AND USE WOULD BE SUBJECT TO WPB |
| | UTILITIES RATES, FEES, AND CHARGES. THERE MAY ALSO BE |
| | ADDITIONAL FEES FOR COST OF THE METER. |
| | |
| | -WPB UTILITIES DOES NOT STOCK M5000 METERS. THERE MAY |
| | BE 6 MONTHS OR MORE LEAD TIME AFTER QUOTES AND FEES ARE |
| | PAID. |
| | |
| | -HAS EOR CONSIDERED A SEPTIC SYSTEM IN LIEU OF FORCE |
| | MAIN AND PUMP STATION? |
| | |
| | PREVIOUSLY EMAILED COMMENTS FROM TRACY WARD, SR. |
| | STORMWATER ENG., ENGINEERING SERVICES, [email protected] |
| | 561-494-1120: |
| | |
| | THE RESPONSE TO MY PRB COMMENT DOESN???T ADDRESS THE |
| | CONCERN I HAVE. WRAPPING THE PIPE JOINTS OF THE |
| | EXFILTRATION PIPE WILL DO LITTLE TO STOP THE PLUGGING |
| | OF THE SLOTS OF THE EXFILTRATION PIPE FROM MATERIAL |
| | ENTERING AT THE CATCH BASINS. INSTALLING PRB???S OVER |
| | THE EXFILTRATION PIPE CONNECTIONS WILL REDUCE ANY |
| | SEDIMENT FROM ENTERING THE EXFILTRATION PIPE. IT???S A |
| | PRIVATE DRAINAGE SYSTEM SO THEY WILL LIKELY HAVE TO |
| | REHAB/REPLACE THE EXFILTRATION TRENCH ON A FASTER |
| | TIMELINE. |
| | |
| | COMMENTS FROM MIKE TECHNOW, PUB. UTILITIES ENGINEER, |
| | [email protected], 561-494-1047: |
| | |
| | -PLEASE SHOW LOCATION OF PROPOSED WASTEWATER METER AND |
| | CALL TO BE INSTALLED ABOVE GROUND IN A LOCATION WITH |
| | SAFE ACCESS FOR OPERATION & MAINTENANCE. |
| | |
| | |
| | |
| |