2022-11-08 14:08:40E22100031 - FPL KRAKEN SUBSTATION, FIRST REVIEW
  
 COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR SEWER (AVERAGE, MAXIMUM AND PEAK).
 CALCULATIONS SHALL BE PER FAC 64-E.008 FOR SEWER.
 4. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 5. PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, GREASE TRAPS, ETC. INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, POTABLE AND
 IRRIGATION METERS, BACKFLOWS, FIRE HYDRANTS AND FDCS,
 AND OTHER DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. GATE
 VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR SIDEWALK.
 ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE
 VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON
 PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. PLEASE
 SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPES SIZES AND
 MATERIALS, LOCATED ON THE RIGHT-OF-WAY.
 6. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 7. PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES AT ALL UTILITY CROSSINGS WITHIN ROW PER
 CITY OF WEST PALM BEACH STANDARD DETAIL GN-2 SERIES.
 PLEASE SHOW ALL EXISTING AND PROPOSED UNDERGROUND
 UTILITY LAYOUT, INCLUDING FIBER OPTIC, ELECTRIC, GAS,
 AND CABLEVISION & TELECOMMUNICATION FACILITIES WITH
 PIPE MATERIAL AND SIZE, LOCATED ON THE RIGHT-OF-WAY.
 8. PLEASE CLEARLY LABEL ROAD RIGHT OF WAY.
 9. IF SANITARY LINES ARE PROPOSED IN ROW PLEASE SHOW
 ADJACENT SANITARY LATERAL LOCATIONS AND SHOW ADDRESSES
 OF ADJACENT PARCELS.
 10. IF TRENCHING IN IN CITY-MAINTAINED ROADWAY AREAS
 ADD NOTE TO PROVIDE 50 FT. PAVEMENT RESTORATION
 TRANSITION ON EACH SIDE OF PROPOSED TRENCH PER CITY OF
 WPB STANDARD DETAIL GC-4.
 11. PLEASE PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 12. PLEASE ADD ADDRESS TO COVER SHEET OF PLANS.
 13. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (E-XXXXXXXX).
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
  
 -VERIFY WELL WILL BE USED FOR IRRIGATION WATER, POTABLE
 WATER, AND LIFT STATION BACKFLOW ASSEMBLY WATER.
  
 -VERIFY SOURCES OF WATER-WASTE BEING PUMPED IN FORCE
 MAIN AND APPROXIMATE THE MONTHLY VOLUME OF WASTEWATER
 PUMPED.
  
 -WPB UTILITY BILLING IS REVIEWING HOW WASTEWATER WILL
 BE BILLED. FURTHER REQUIREMENTS MAY BE NEEDED BASED ON
 RESPONSE LETTER AND THEIR EVALUATION.
  
 -WHAT IS THE PRESSURE IN THE 16 INCH CITY FORCE MAIN
 PROPOSING TO CONNECT THE PRIVATE FORCE MAIN TO?
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
 1. CONVERSION FACTOR BETWEEN NAVD88 AND NGVD29 IS ON
 THE SURVEY (+1.56) IS DIFFERENT FROM WHAT IS LISTED ON
 THE ENGINEERING PLANS (-1.545). NOTE VALUES IN NGVD1929
 SHOULD BE HIGHER THAN VALUES IN NAVD1988 FOR THE SAME
 GROUND POINT. I.E. 0.00 FT NAVD88 = +1.56 FT NGVD29 (OR
 +1.545 FT NGVD29).
 2. PROVIDE PRB???S FOR ALL PIPE CONNECTIONS TO
 EXFILTRATION TRENCH TO PROLONG THE LIFE OF THE
 EXFILTRATION TRENCH.
 3. CALLOUT INLET PROTECTION FOR THE EXISTING DRAINAGE
 STRUCTURES AT THE BEGINNING (EAST END) OF 47TH PLACE
 NORTH ROAD CONSTRUCTION.
 4. INCORPORATE RIGHT OF WAY AS-BUILT INFORMATION FROM
 THE HOME PLACE DEVELOPMENT ON THE SOUTH SIDE OF 47TH
 PLACE NORTH.
 5. SHEET E-KRA01J (1 OF 2)
 A. ADD NOTE SIMILAR TO GENERAL NOTE #14 BUT FOR WORK
 WITHIN CITY OF WEST PALM BEACH R/W???S.
 6. SHEET E-KRA02 (SHEET 1 OF 7)
 A. THE PIPE SCHEDULE IS MISSING FOR THE PROPOSED 2 INCH
 PVC FORCE MAIN.
  
 COMMENTS FROM MIKE TECHNOW, PUB. UTILITIES ENGINEER,
 [email protected], 561-494-1047:
  
 - VERIFY THAT THE MOPS HAS BEEN DESIGNED TO PROVIDE
 ADEQUATE PRESSURE TO OVERCOME THE 518 FT. RUN AND
 CONNECTION INTO CITY SYSTEM. WAS THERE A PRESSURE TEST
 DONE ON THE CITY FM?
  