| Date |
Text |
| 2022-12-19 13:20:58 | E220250017 - 300 BANYAN - 301 CLEMATIS 9.30.22 |
| | RESUBMITTAL |
| | NO COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, |
| | ENGINEERING SERVICES DEPT., 561-494-1098 |
| | [email protected] : |
| | |
| | MARK HURLEY, FIELD CUSTOMER SERVICE SUPER., WPB PUBLIC |
| | UTILITIES, 561-822-2262 OR [email protected]: |
| | -C4.5. ADD ADDRESS TO LABEL OF METER SHOWN IN PROFILE. |
| | |
| | -UPDATE PROFILE ON C4.5 TO SHOW GV3 AND TAP SIZE TO |
| | MATCH PLAN VIEW. SHOULD BE 4 INCH. |
| | |
| | -RESPONSE LETTER SAID THAT FPL UNDERGROUND CONDUIT WILL |
| | RUN UNDER ALL OTHER UTILITIES ACROSS ALLEY AND THAT |
| | LOCATIONS HAVE BEEN ADDED TO PLANS. CANNOT FIND ON |
| | PLANS AND PROFILES. PLEASE ADD. |
| | |
| | -SHEET C4.2. ADD SIZE OF PROPOSED DCDA FOR 301 CLEMATIS |
| | TO CALLOUT LABEL. |
| | |
| | -SHEET C4.2. ONE OF THE EXISTING METERED WATER SERVICES |
| | NEAR NORTHWEST CORNER OF PROPERTY IS NOT LABELED FOR |
| | REMOVAL. ADD ADDITIONAL LEADER LINE. |
| | |
| | -STILL MISSING SIGNED, SEALED, AND DATED FLOW |
| | CALCULATIONS FOR EACH OF THE LARGE DOMESTIC WATER |
| | SERVICES AND EACH OF THE FIRELINES AS DESCRIBED IN SD |
| | WS5 AND WS7. (THIS IS SEPARATE FROM WATER DEMAND |
| | CALCULATIONS) |
| | |
| | -ON SHEET C4.3, ADD NOTE ABOUT DIMENSIONS AND DEPTH OF |
| | 301 CLEMATIS BUILDING EXISTING FOUNDATION FOOTER THAT |
| | IS NEAR PROPOSED 3 INCH METER AND BACKFLOW. |
| | |
| | -RESPONSE LETTER SAID THAT ALL OF THE EXISTING SEWER |
| | LATERALS IN ALLEY FOR 301 CLEMATIS WERE REMAINING. |
| | PLEASE ADD NOTE OR CALLOUT IN PLANS COMMUNICATING THAT. |
| | |
| | -NO CLEANOUTS ARE SHOWN FOR EXISTING 301 CLEMATIS SEWER |
| | LATERALS IN ALLEY, BUT HISTORIC PICTURES SHOW THEM. |
| | SHOW ON PLANS AND LABEL WITH ELEVATIONS. ENSURE NO |
| | CONFLICTS SUCH AS GATE VALVE AND CLEANOUT IN SAME |
| | LOCATION. |
| | |
| | -DOES NOT APPEAR TO BE ENOUGH ROOM FOR BYPASS BOX ON |
| | EAST SIDE OF 300 BANYAN LARGE METER. PLEASE SHOW IT ON |
| | WEST SIDE INSTEAD OF EAST. |
| | |
| | -ADD NOTE TO WATER PLANS THAT UTILITY BOXES FOR METER |
| | BYPASS BLOWOFF NEED TO BE CDR TIER 22 FLARED WALL WITH |
| | 17 INCH X 30 INCH LID. |
| | |
| | RICKY ELIZONDO, PUB. UTILITIES PLAN EXAMINER, |
| | [email protected], 561-494-1101: |
| | |
| | SHEET C4.1 |
| | -PLEASE DENOTE PROPOSED PIPE TAPS AS ???TAPPING SLEEVE |
| | AND VALVE??? RATHER THAN ???TEE AND TAPPING VALVE) |
| | |
| | -ADD THE LENGTH OF THE PROPOSED 8??? DIP FIRE LINE |
| | |
| | -DENOTE GATE VALVES 1B AND 4 AS POINTS OF SERVICE |
| | |
| | -CALLOUT FOR UTILITY EASEMENT IS NOT POINTING AT THE |
| | MARKING SHOWN ON THE PLAN. |
| | |
| | SHEET 4.4 |
| | |
| | -PROFILE IS MISLABELED, SHOULD BE CALLED ???WATER MAIN |
| | PROFILE??? |
| | |
| | -3??? INCH WM TAP NOTED ON PROFILE IS LABELED AS 4??? |
| | TAP ON PLANS, PLEASE REFLECT AS SUCH |
| | |
| | -CALL OUT THE MATERIAL FOR THE EXISTING ELECTRICAL |
| | BUNDLE ON THE PROFILE. |
| | |
| | SHEET 4.5 |
| | |
| | -DENOTE TAPPING SLEEVE AS 4X4 WITH GV 3 LABELED AS A |
| | 4???. |
| | |
| | |
| | TRACY WARD, SR. STORMWATER ENG., ENGINEERING SERVICES, |
| | [email protected] 561-494-1120 |
| | |
| | COMMENTS ON THE 300 BANYAN BLVD / 301 CLEMATIS ST PLANS |
| | (S&S 9/30/2022) E22020017 |
| | |
| | 1. SHEET C2.1 EXISTING CONDITIONS & DEMO. PLAN |
| | A. PROVIDE THE SIZE AND MATERIAL OF THE SHORT PIPE |
| | SEGMENT CONNECTED ON THE NORTH SIDE OF THE EXISTING |
| | WEST CATCH BASIN IN THE ALLEY AND INDICATE IF IT IS TO |
| | BE REMOVED OR IS TO REMAIN. |
| | B. WHICH PIPE DOES THE NORTH INVERT ELEVATION OF 8.97 |
| | FT NAVD REFER TO AT THE EXISTING WEST CB IN THE ALLEY? |
| | C. THE EXISTING EAST CB IN THE ALLEY IS CALLED OUT TO |
| | BE CONVERTED TO A STORM MANHOLE (NOTE TYPO STH VS STM). |
| | SHEET C3.1 CALLS FOR REMOVAL OF THE EXISTING CB. |
| | D. WHAT IS THE TIMING OF THE BANYAN PHASE 2 |
| | IMPROVEMENTS AND THIS PROJECT???S PROPOSED IMPROVEMENTS |
| | IN THE BANYAN BLVD R/W OR ADJACENT TO THE SOUTH R/W OF |
| | BANYAN BLVD? |
| | 2. SHEET C3.1 PAVING & GRADING PLAN |
| | A. EXISTING EAST CB IN THE ALLEY IS CALLED TO BE |
| | REMOVED. INDICATE WHAT IS THE DONE WITH THE 10??? PVC |
| | RAIN WATER LEADER THAT IS CONNECTED TO THE STRUCTURE. |
| | IF BY TEE TO THE 24??? ADS, THEN A CLEANOUT AT THE |
| | BUILDING WILL BE NEEDED AND POSSIBLY AN AIR GAP. |
| | B. SPOT GRADE OF 12.00 NORTH OF STRUCTURE S-109 COUPLED |
| | WITH FINISHED FLOOR ELEVATION OF 12.30 AT THE DOOR |
| | OPENING WILL RESULT IN SURFACE SLOPE STEEPER THAN 2%. |
| | DOES THE SLOPE NEED TO BE 2% OR FLATTER? |
| | C. PROPOSED GRADE OF THE EAST END OF THE ALLEY (SPOT |
| | GRADE OF 11.90 FT NAVD) WILL RESULT IN RAMP SLOPE IN |
| | EXCESS OF 20% (EXISTING PAVEMENT SLOPE IS BETWEEN 11.28 |
| | AND 11.11 FT NAVD). CONFIRM THERE IS SUFFICIENT |
| | SIDEWALK WIDTH WITH SLOPE OF 2% OR FLATTER ADJACENT TO |
| | THE ALLEY R/W. |
| | D. INCORPORATE BANYAN BLVD PHASE 2 DRAINAGE |
| | IMPROVEMENTS ON THE PLANS. INDICATE WHAT WILL BE |
| | CONSTRUCTED BY OTHERS (E.G. BY THE BANYAN BLVD |
| | PROJECT). LATEST BANYAN PLANS HAVE REVISION #9. |
| | I. THE TWO DRAINAGE STRUCTURES (S1-89B AND S-189F) AND |
| | STORM PIPE IN THE BACK OF THE PARKING AREAS. |
| | II. DRAINAGE MANHOLE (S-189C) IN THE CENTER OF BANYAN |
| | BLVD. |
| | III. DRAINAGE STRUCTURE (S-189A) TO THE WEST OF THE |
| | DRIVEWAY ENTRANCE. |
| | IV. CONVERTED INLET TO MANHOLE (S-189) AT THE CORNER OF |
| | BANYAN BLVD AND OLIVE AVE. |
| | V. PROVIDE CURB ALIGNMENT AND GRADING PLAN TO |
| | TRANSITION NEW CURB LOCATION IN FRONT OF THIS |
| | DEVELOPMENT TO THE EXISTING CURB TO THE WEST. |
| | VI. CONFIRM WITH THE CITY???S PROJECT MANAGER (VLADIMIR |
| | JEANNOT ??? TELEPHONE NO. 561-494-1107) FOR THE BANYAN |
| | BLVD PROJECT THAT THE VALET DROPOFF IS TO SLOPE FROM |
| | SOUTH TO NORTH TO THE VALLEY GUTTER. |
| | E. FULL SIDEWALK WIDTH (8 FEET?) IS TO HAVE CROSS SLOPE |
| | OF 2% OR FLATTER ALONG BANYAN BLVD AND OLIVE AVE |
| | FRONTAGES. |
| | F. VALET DROP AREA ON OLIVE AVE APPEARS TO HAVE VARYING |
| | CROSS SLOPE BETWEEN 5% AND 7%. |
| | G. LABEL THE PROPOSED CURB AND GUTTER TYPES ALONG |
| | BANYAN BLVD., INCLUDING THE BACK OF THE VALET DROPOFF |
| | AREA. |
| | H. SHOW AND LABEL THE BACK OF SIDEWALK ALONG BANYAN |
| | BLVD AND OLIVE AVE FRONTAGES. PROVIDE WIDTH DIMENSIONS |
| | FOR THE SIDEWALK. |
| | I. CHECK EXISTING AND PROPOSED LINEWORK ALONG BANYAN |
| | BLVD. THE EXISTING DASHED LINES FOR THE CURB AND GUTTER |
| | DOES NOT MATCH WHAT IS SHOWN ON SHEET C2.1. |
| | 3. SHEET C3.2 DRAINAGE PLAN |
| | A. EXISTING EAST CB IN THE ALLEY IS CALLED OUT TO BE |
| | MODIFIED TO A STORM MH RING AND COVER. SEE COMMENT NO. |
| | 2.A. ABOVE. DOES THE STRUCTURE NEED TO BE MODIFIED |
| | OTHER THAN ADJUSTING THE GRATE ELEVATION TO THE |
| | PROPOSED ALLEY GRADE? CAN STRUCTURE S-109 BE MOVED TO |
| | THE EAST TO REPLACE THE EXISTING EAST CB? |
| | B. PROVIDE PROPOSED RIM ELEVATION AND EXISTING INVERT |
| | ELEVATIONS FOR THE EXISTING EAST CB IN THE ALLEY. |
| | C. CONFIRM SE INVERT ELEVATION OF 7.05 FT NAVD FOR THE |
| | EXISTING 12??? STORM PIPE CONNECTION AT STRUCTURE CS-1. |
| | THE NORTH INVERT OF THE EXISTING 12??? STORM PIPE IS |
| | LISTED AS 8.86 FT NAVD AT THE EXISTING WEST CB. |
| | D. LABEL THE PIPE MATERIAL FOR THE EXISTING 12??? STORM |
| | PIPE. |
| | E. THE NORTH AND WEST INVERTS AT THE EXISTING WEST CB |
| | ARE LISTED AS 8.86 FT AND 7.14 FEET NAVD, RESPECTIVELY. |
| | SHEET C2.1 LISTS THE NORTH AND WEST INVERTS AS 8.97 FT |
| | AND 7.10 FT NAVD, RESPECTIVELY. |
| | F. SEE COMMENT 2.D. ABOVE REGARDING INCORPORATING THE |
| | BANYAN BLVD IMPROVEMENTS. |
| | G. PROVIDE STRUCTURE NUMBERS FOR THE EXISTING CBS IN |
| | THE ALLEY. THIS WILL FACILITATE SHOP DRAWING REVIEW AND |
| | FIELD REPORTING. |
| | H. SHOW IN A DIFFERENT LINE TYPE (DIFFERENT FROM EXDN) |
| | THE PROPOSED 24??? ADS BETWEEN THE EXISTING WEST CB AND |
| | STRUCTURE S-109. |
| | I. INCLUDE A PRB FOR WEST INVERT AT STRUCTURE CS-1. |
| | J. INCLUDE THE WEIR ELEVATION IN THE CALLOUT FOR |
| | STRUCTURE CS-1. |
| | K. WHAT IS THE CALLOUT FOR 18 LF, 18??? HDPE POINTING |
| | TO BETWEEN STRUCTURES S-104 AND S-105? |
| | L. LABEL THE DASHED LINES ACROSS THE EAST END OF THE |
| | ALLEY. IF THIS IS A TRENCH DRAIN, MOVE TO THE WEST TO |
| | BE OUT OF THE OLIVE AVE SIDEWALK AREA. |
| | M. CHECK THE LINE WORK ALONG BANYAN BLVD. THE EXISTING |
| | CURB AND GUTTER APPEARS TO BE SHOWN IN SOLID AND DASHED |
| | LINES. |
| | 4. SHEET C3.3 SIGNING & STRIPING PLAN |
| | A. IF ALLEY IS ONE-WAY EAST BOUND THEN A DO NOT ENTER |
| | SIGN SHOULD BE ATTACHED OR POLE MOUNTED ON THE EAST |
| | SIDE OF THE 301 CLEMATIS ST BUILDING. |
| | B. INCLUDE STOP BAR AND ???STOP??? LETTERING ACROSS THE |
| | ALLEY BEFORE THE N. OLIVE AVE R/W. |
| | C. CONSIDER A PAINTED LEFT ARROW ON THE ALLEY PAVEMENT |
| | UNLESS ALLEY WILL BE PAVERS. |
| | D. CHECK EXISTING AND PROPOSED LINEWORK ALONG BANYAN |
| | BLVD. THE EXISTING DASHED LINES FOR THE CURB AND GUTTER |
| | DOES NOT MATCH WHAT IS SHOWN ON SHEET C2.1 |
| | 5. SHEET C4.1 WATER & SEWER PLAN |
| | A. EXISTING CBS IN THE ALLEY ARE NOT SHOWN. |
| | B. CONFLICT #1 ??? TOP OF 24??? STORM LISTED AS 6.70 |
| | FEET NAVD. AT STRUCTURE S-109, 18 FEET TO THE WEST, THE |
| | PIPE INVERT ELEVATION IS 6.70 FEET NAVD. PLEASE CONFIRM |
| | THESE ELEVATIONS. |
| | C. SEE COMMENT #3.H. ABOVE REGARDING STORM PIPE LINE |
| | TYPE. |
| | D. CHECK EXISTING AND PROPOSED LINEWORK ALONG BANYAN |
| | BLVD. THE EXISTING DASHED LINES FOR THE CURB AND GUTTER |
| | DOES NOT MATCH WHAT IS SHOWN ON SHEET C2.1 |
| | 6. SHEET C4.2 WATER & SEWER PLAN |
| | A. SEE COMMENT #3.H. ABOVE REGARDING STORM PIPE LINE |
| | TYPE. |
| | 7. SHEET C4.3 WATER & SEWER PLAN |
| | A. EXISTING EAST CB IN THE ALLEY IS NOT SHOWN. |
| | B. SEE COMMENT #3.H. ABOVE REGARDING STORM PIPE LINE |
| | TYPE. |
| | C. WHAT DETERMINED THE LENGTH AND LOCATION OF THE 8??? |
| | DIP SLEEVE FOR THE 4??? WM? |
| | 8. SHEET C4.4 WATER, SEWER & DRAINAGE PROFILE |
| | A. EXISTING CBS IN THE ALLEY ARE NOT SHOWN. |
| | B. PROFILE VIEW LABELS THE EXISTING WEST CB AS AN |
| | EXISTING STRUCTURE. SHEET C3.2 CALLS FOR THE STRUCTURE |
| | TO BE REPLACED. SHOW THE NEW STRUCTURE AND NEW 24??? |
| | ADS STORM PIPE IN PROFILE. |
| | C. COORDINATE THE INVERT ELEVATIONS SHOWN FOR THE STORM |
| | STRUCTURES ON THE PROFILE WITH THE INFORMATION PROVIDED |
| | ON SHEET C3.2. |
| | D. PROPOSED 15??? RCP CALLED OUT AT EXISTING STORM |
| | STRUCTURE. IS THIS PIPE SUPPOSE TO CONNECT TO THE |
| | EXISTING 12??? STORM PIPE CALLED OUT ON SHEET C3.2? DO |
| | NOT MIX PIPE DIAMETERS BETWEEN STRUCTURES. |
| | E. CALLOUT THE REMOVAL OF THE EXISTING DRAINAGE PIPE |
| | BETWEEN THE EXISTING WEST CB AND THE PROPOSED STORM |
| | STRUCTURE ON THE PROFILE. |
| | F. LABEL THE DRAINAGE STRUCTURES ON THE PROFILE. |
| | G. CORRECTLY SHOW THE ROADWAY GRADE, PARTICULARLY THE |
| | CROSS SLOPE OF THE OLIVE AVE PORTION. |
| | 9. SHEET C4.5 WATER, SEWER & DRAINAGE PROFILE |
| | A. EXISTING EAST CB NOT SHOWN. |
| | B. DON???T PUT THE NORTH-SOUTH STORM PIPE ON THE SAME |
| | PROFILE AS THE EAST-WEST UTILITIES. PUT ON SEPARATE |
| | PROFILE GRID. |
| | C. PROPOSED 15??? RCP CALLED OUT AT EXISTING STORM |
| | STRUCTURE. IS THIS PIPE SUPPOSE TO CONNECT TO THE |
| | EXISTING 12??? STORM PIPE CALLED OUT ON SHEET C3.2? |
| | D. CALLOUT THE REMOVAL OF THE EXISTING DRAINAGE PIPE |
| | BETWEEN THE EXISTING WEST CB AND THE PROPOSED STORM |
| | STRUCTURE ON THE PROFILE. |
| | E. STRUCTURE S-109 SHOWN AS EXISTING STRUCTURE (DASHED |
| | LINES) ON THE PROFILE. |
| | F. EXISTING EAST CB NOT SHOWN ON THE [PROFILE. |
| | G. IS THE EXISTING 10 RWL BEING RE-ROUTED TO STRUCTURE |
| | S-109 OR STAYING CONNECTED TO THE EXISTING EAST CB? |
| | H. THE INVERTS FOR THE 59 LF 24??? ADS STORM PIPE |
| | APPEARS TO BE DRAWN AT 4.7 FT AND 4.3 FT NAVD BUT THEY |
| | ARE LABELED AS 7.7 FT AND 7.3 FT. |
| | I. LABEL THE STRUCTURE TO THE RIGHT OF THE EXISTING |
| | STORM STRUCTURE (PROFILE VIEW). IF THIS IS STRUCTURE |
| | CS-1, THE PIPE INVERTS FOR THE PROPOSED 15??? RCP DO |
| | NOT MATCH SHEET C3.2. SHEET ALSO INDICATES THE EXISTING |
| | 12??? PIPE IS TO REMAIN. |
| | J. SHOW THE PROPER SUMPS FOR THE PROPOSED DRAINAGE |
| | STRUCTURES. |
| | 10. SHEET C5.1 PAVING, GRADING & DRAINAGE DETAILS |
| | A. CONFIRM PIPE SIZES AND PIPE INVERT AND WEIR |
| | ELEVATIONS SHOWN ON THE CS-1 WEIR BOX DETAIL. |
| | B. SHOW PRB ON THE CS-1 WEIR BOX DETAIL. |
| | C. CALLOUT MANHOLE FRAME AND GRATE FOR ANY MANHOLES TO |
| | BE WITHIN THE R/W. |
| | 11. SHEET C5.2 PAVING, GRADING & DRAINAGE DETAILS |
| | A. PROVIDE PAVEMENT SECTION DETAILS FOR SUBGRADE, BASE |
| | AND PAVEMENT CONSTRUCTION. NOTE SUPERPAVE IS TO BE USED |
| | WITHIN THE R/W. |
| | B. CALLOUT PAVEMENT SECTIONS THICKNESSES AND |
| | CURB/GUTTER TYPES ON THE SECTIONS. |
| | C. PROVIDE A SECTION FOR THE ALLEY RIGHT OF WAY. |
| | D. SECTION A |
| | I. LABEL THE STREET R/W. |
| | II. DIMENSION THE DISTANCE FROM THE R/W (P/L) TO THE |
| | BACK OF VALLEY GUTTER TO THE LEFT PUBLIC R/W LINE AND |
| | TO THE FACE OF BUILDING. |
| | III. SHOW WHERE THE SIDEWALK AREA ALIGNS WITH THE |
| | DRIVEWAY APRON AND PROVIDE DIMENSIONS FOR THE SIDEWALK |
| | WIDTH AND THE DISTANCE FROM BUILDING FACE OR R/W. |
| | IV. CONFIRM THE ELEVATIONS SHOWN ON THE SECTION. |
| | E. SECTION B |
| | I. COORDINATE THE DESIGN (E.G. SLOPE DIRECTION) OF THE |
| | PROP. VALET DROPOFF AREA. |
| | II. DIMENSION THE PROP. VALET DROPOFF AREA AND THE |
| | DISTANCE FROM THE R/W (P/L) TO THE FACE OF THE |
| | BUILDING. |
| | III. SHOW WHERE THE SIDEWALK WILL BE. DIMENSION THE |
| | ???EDGE??? OF SIDEWALK WIDTH AND THE DISTANCE THE |
| | SIDEWALK IS FROM THE R/W OR BUILDING FACE. |
| | IV. CONFIRM THE ELEVATIONS SHOWN. SHEET C3.1 SHOWS A |
| | SPOT GRADE OF 12.25 FT ADJACENT TO THE BUILDING WEST OF |
| | THE SECTION LINE. |
| | F. SECTION C |
| | I. DIMENSION THE WIDTHS OF THE VALET DROPOFF AREA AND |
| | THE TREE PLANTER |
| | II. DIMENSION THE DISTANCE FROM THE R/W (P/L) TO THE |
| | FACE OF BUILDING AND TO THE RIGHT LINE OF THE PUBLIC |
| | R/W. |
| | III. SHOW WHERE THE SIDEWALK WILL BE. DIMENSION THE |
| | SIDEWALK WIDTH AND THE DISTANCE THE ???EDGE??? OF |
| | SIDEWALK IS FROM THE R/W OR BUILDING FACE. |
| | G. SECTION D |
| | I. DIMENSION THE WIDTHS OF THE VALET DROPOFF AREA AND |
| | THE TREE PLANTER |
| | II. DIMENSION THE DISTANCE FROM THE R/W (P/L) TO THE |
| | FACE OF BUILDING AND TO THE RIGHT LINE OF THE PUBLIC |
| | R/W. |
| | III. SHOW WHERE THE SIDEWALK WILL BE. DIMENSION THE |
| | SIDEWALK WIDTH AND THE DISTANCE THE ???EDGE??? OF |
| | SIDEWALK IS FROM THE R/W OR BUILDING FACE. |
| | IV. SHOW THE TYPE OF CURB AT THE BACK OF PROP. VALET |
| | DROPOFF AREA (WHERE THERE WILL NOT BE A TREE PLANTER). |
| | 12. SHEET C6.5 WATER & WASTEWATER DETAILS |
| | A. INDICATE THE ALLEY RECONSTRUCTION TYPICAL SECTION |
| | CONCEPT IS ???LOOKING EAST??? OR LABEL THE NORTH AND |
| | SOUTH R/W LINES. |
| | B. ARE THE CONFLICT STRUCTURE DETAILS STILL NEEDED? |
| | 13. SHEET C7.1 EROSION CONTROL PLAN |
| | A. THE INLET IN FRONT OF THE NORTH CONSTRUCTION |
| | ENTRANCE SHOULD EXTRA PROTECTED FROM SEDIMENT ENTERING |
| | THE STRUCTURE. WILL THIS INLET BE CONVERTED TO A VALLEY |
| | GUTTER INLET PRIOR TO OR DURING THE ONSITE |
| | CONSTRUCTION? |
| | B. EXISTING CBS (ALLEY AND BANYAN BLVD) NOT SHOWN. |
| | C. CALLOUT INLET PROTECTION AND PROVIDE A DETAIL. |
| | D. CHECK EXISTING AND PROPOSED LINEWORK ALONG BANYAN |
| | BLVD. THE EXISTING DASHED LINES FOR THE CURB AND GUTTER |
| | DOES NOT MATCH WHAT IS SHOWN ON SHEET C2.1 |
| | 14. PROVIDE DETAILS FOR: |
| | A. VALLEY GUTTER |
| | B. OTHER CURB AND CURB AND GUTTER TYPES TO BE |
| | CONSTRUCTED. |
| | |
| | |
| | VLADIMIR JEANNOT, PMP, SPECIAL PROJECT MGR., |
| | ENGINEERING SERVICES [email protected] P: 561.494.1107 |
| | C: 561.356.3230 |
| | 1- LABEL CATCH BASIN IN PLAN TO REFERENCE CCTV DONE BY |
| | SHENANDOAH. PROVIDING A KEY MAP WOULD BE HELPFUL ALSO |
| | 2- LABEL SANITARY SEWER MANHOLE TO REFERENCE CCTV DONE |
| | BY SHENANDOAH. PROVIDING A KEY MAP WOULD BE HELPFUL |
| | ALSO |
| | 3- PLAN SHOWS ALL STORM TO BE A SIZE OF 24??? HDPE. |
| | HOWEVER, CCTV SHOWS VARYING SIZES; PLEASE CONFIRM AND |
| | NOTE APPROPRIATELY IN THE PLANS. |
| | 4- SHOW ALL SANITARY, WATER MAIN AND STORM CONNECTIONS |
| | OR TAPS ON PLANS |
| | 5- IDENTIFY/LABEL ALL UTILITIES IN THE RIGHT OF WAY |
| | 6- WILL VIBRATION MONITORING BE PROVIDED? |
| | 7- HAS A PLAN BEING DISCUSSED ON HOW TO ADDRESS THE |
| | ISSUES IDENTIFIED IN THE CCTVS? |
| | 8- HAVE WE DONE SOFT DIGS TO CONFIRM ELEVATIONS OF |
| | EXISTING UTILITIES? |
| | 9- HAS MARK HURLEY CONFIRM IF THE METERS IN THE ALLEY |
| | ARE ACTIVE OR NOT? |
| | 10- IT APPEARS THAT THE WATER WILL NEED TO BE |
| | DISCONNECTED TO INSTALL THE DRY UTILITY CONDUITS? IF |
| | SO, IS THERE A PLAN FOR A TEMPORARY WATER MAIN? HOW |
| | WILL SERVICE BE MAINTAINED FOR THOSE PROPERTIES? |
| | 11- GAS MAIN SEEMS TO BE IN CONFLICT WITH THE PROPOSED |
| | DRY UTILITIES AS WELL. |
| | 12- PROVIDE UTILITY CONFLICT TABLE? |
| | 13- MERGE THE 300 ALLEYWAY PLAN WITH THE ENGINEERING |
| | SUBMITTAL PLAN FOR 300 BANYAN FOR BETTER COORDINATION |
| | OF WORK AND CONFLICTS |
| | |
| | |
| |