Plan Review Notes
Plan Review Notes For Project E17010029
Project Number E17010029
Review Stop ENG-A
Sequence Number 2
Notes
Date Text
2017-08-04 16:54:00APPROVED WITH CONDITIONS:
  
 - CITY WILL INSPECT PROPOSED 10-FT CROSSWALK AND STOP
 BAR ALONG PARK PL SHALL BE DESIGNED AND INSTALLED PER
 FDOT STANDARDS. PAVEMENT MARKING WILL BE IN
 THERMOPLASTIC.
  
 - CITY WILL INSPECT PROPOSED CR-C CURB RAMP ON SOUTH
 CORNER OF PARK PL.
  
 - ISOLATION VALVE WILL BE REQUIRED BETWEEN THE CITY
 WATERMAIN AND PRIVATE FIRELINE.
  
 - UNDERGROUND CONTRACTOR NEITHER THE CITY CONSTRUCTION
 COORDINATOR DID NOT ATTEND THE MEETING ON 08/04/2017 TO
 EVELUATE PENDING ENGINEERING PERMIT COMMENTS.
  
 - APPROVED MATERIAL LIST MUST BE SUBMITTED TO THE CITY.
  
 - BACKFLOW PREVENTION AND FITTING CUT-SHEET MUST BE
 PROVIDED TO THE CITY. ITEMS SHALL BE LEAD-FREE.
  
 SINCERELY,
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 P: 561.494.1040 EXT: 1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved