Plan Review Notes
Plan Review Notes For Project E16100008
Project Number E16100008
Review Stop ENG-A
Sequence Number 1
Notes
Date Text
2016-10-04 12:56:11PASSED WITH PROVISOS:
  
 #1 DCDA AND RPPA SHALL BE AS CLOSE TO SOURCE AS
 POSSIBLE. CITY OF WPB WILL OWN ALL ROW PIPING.
  
 #2 CONTRACTOR SHALL VERIFY 10" WM AS TO PERFORMANCE
 FLOWS.
  
 #3 ALL BACKFLOW PIPING AND BACKFLOWS SHALL BE:
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW: HTTP://WP
 B.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICATIONS/B
 ACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
  
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved