| Plan Review Notes For Project E16050077 |
| Project Number |
E16050077 |
|
| Review Stop |
ENG-A |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-05-27 17:07:51 | PROVISOS: | | | | | | 1. MUNICODE 94-450 STORMWATER POLLUTION PREVENTION PLAN | | | REQUIRED AT ALL TIMES. | | | 2. ALL WORK MUST BE PERFORMED IN ACCORDANCE TO THE | | | APPROVED SITE PLAN. | | | 3. A SEPARATE PAVING PERMIT IS REQUIRED THRU CITY OF | | | WPB DEVELOPMENT SERVICES DEPT ( BUILDING DEPT.) | | | 4. ENGINEER OF RECORD SHALL INSPECT AND CERTIFY TO CITY | | | OF WPB. | | | 5. PROVIDE ALL CLOSE OUT AS-BUILTS AND CERTIFICATIONS | | | WITH FIELD CALCULATIONS TO UPDATE CITY'S STORMWATER | | | ACCOUNT. | | | 6. CLOSURE OF ALL PERMITS WILL BE REQUIRED AT TIME OF | | | PERMIT C.O. REQUEST. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | |
| |
Print |
|