| 2015-04-20 22:38:35 | PLEASE RESPOND TO COMMENTS IN WRITING: |
| | |
| | 1. THE PEAK STAGES IN THE MODEL OCCUR AND THE END OF |
| | THE MODEL RUN (HOUR 72 AND 24). PLEASE EXTEND THE MODEL |
| | DURATION PAST THE END OF THE STORM EVENT TO SHOW THE |
| | PEAK STAGES DO NOT CONTINUE TO INCREASE. |
| | |
| | 2. PLEASE INCLUDE A BASIN MAP. |
| | |
| | 3. THE MODEL ASSUMES A DCIA OF 0% FOR ALL OF THE NODES, |
| | BUT SEVERAL OF THE BASIN AREAS HAVE INLETS WITHIN PAVED |
| | AREAS. PLEASE ADJUST THE DCIA TO REFLECT THE DESIGN. |
| | |
| | 4. DO THE AREAS USED IN THE STAGE-STORAGE CALCULATIONS |
| | INCLUDE THE BUILDING AREAS? |
| | |
| | 5. PLEASE SUBMIT THE CURVE NUMBER CALCULATIONS. |
| | |
| | 6. PLEASE SUBMIT A MASS BALANCE REPORT FOR THE ICPR |
| | MODEL. |
| | |
| | 7. PLEASE INDICATE WHICH NODE THE RATING CURVE IS |
| | ASSIGNED. |
| | |
| | 8. PLEASE INDICATE THE SOURCE OF THE TAILWATER |
| | ELEVATIONS USED IN THE MODEL. |
| | |
| | 9. THE RAINTANKS WERE MODELED AS STAGE AREA NODES WHILE |
| | ONLY A FINITE AMOUNT OF STORAGE IS PROVIDED IN THE |
| | TANKS. PLEASE REVISE THE MODEL TO REFLECT THE STORED |
| | VOLUME RATHER THAN MODELING THEM SIMILARLY TO OPEN |
| | PONDS. |
| | |
| | 10. PLEASE SUBMIT HYDRAULIC GRADE LINE CALCULATIONS FOR |
| | THE PROPOSED ROADWAYS. |
| | |
| | KELLY CRANFORD, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | PUBLIC WORKS DEPARTMENT |
| | ENGINEERING DIVISION |
| | CITY OF WEST PALM BEACH |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | MAILING ADDRESS: P.O. BOX 3366, ZIP 33402 |
| | 561-494-1098 (OFFICE) |
| | |
| | |
| | |
| |
Print |