Plan Review Notes
Plan Review Notes For Project E14120034
Project Number E14120034
Review Stop ENG-A
Sequence Number 1
Notes
Date Text
2015-02-25 12:14:57PASSED WITH PROVISOS:
  
 FOR FINAL RESTORATION OF THE RIGHT-OF-WAY, EACH LANE
 DISTURBED BY THE TRENCH/CONSTRUCTION SHALL BE MILLED
 AND RESURFACED FOR THE ENTIRE LANE WIDTH FOR DISTAANCE
 OF THE TRENCH LENGTH PLAN 50 FEET IN EITHER DIRECTION
 FROM THE TRENCH. WHERE THERE ARE NO LANE LINES ON A 2
 LANE ROADWAY, THE LANE WIDTH WILL BE CONSIDERED TO BE
 50% OF THE PAVED ROAD AREA.
  
 A RIGHT-OF-WAY PERMIT IS REQUIRED TO CLOSE THE ROAD FOR
 CONSTRUCTION.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved