2014-06-02 14:46:231. PALM BEACH COUNTY OR FDOT R/W PERMIT WILL BE NEEDED
 FOR WORK WITHIN OKEECHOBEE BLVD. RIGHT OF WAY.
  
 2. MULTIPLE STORMWATER DETENTION CHAMBERS ARE PROPOSED
 SIDE BY SIDE THROUGH OUT THE SITE. ENGINEER SHOULD
 PROVIDE A DETAIL ON HOW WATER WILL FLOW INTO THE
 ADJACENT CHAMBERS.
  
 3. THE CATCH BASIN SYMBOLS IN SOME INSTANCES APPEAR TO
 BE LOCATED OVER THE VERTICAL WALLS OF THE CHAMBERS.
  
 4. THE LARGE, RECTANGULAR STORMWATER DETENTION CHAMBER
 IN THE MIDDLE OF THE PARKING LOT AND LONG STRETCHES
 SOUTH OF CB-22 AND NORTH OF CB-20 DO NOT SHOW ANY CATCH
 BASIN OPENINGS. HOW WILL TRAPPED AIR BE DISPLACED BY
 THE STORMWATER RUNOFF? HOW WILL THE CHAMBERS BE
 ACCESSED FOR CLEANING?
  
 5. SHEET C-4 CALLS OUT 26 LF OF 24" HDPE PIPE TO THE
 NORTHEAST OUT OF CONTROL STRUCTURE CS-1. THE CONTROL
 STRUCTURE CS-1 DETAIL ON SHEET C-10 LABELS THE PIPE AS
 EX. 24" RCP TO OFFSITE.
  
 6. STORMWATER DETENTION CHAMBER DETAILS ON SHEET C-10
 SHOW TWO 24" X 24" OPENINGS IN THE BOTTOM SLAB FOR
 EXFILTRATION. HOW MANY OPENINGS WILL THERE BE PER 10
 LINEAR FEET OF DETENTION CHAMBERS?
  
 7. CONTROL STRUCTURE CS-1 DETAIL ON SHEET C-10:
 A. WHICH SIDE OF THE WEIR WILL THE 12" PIPE FROM TD-2
 BE ON.
 B. WHAT IS THE FLAP GATE TO PREVENT AND WILL IT FIT
 WITH THE WEIR?
 C. WEIR ELEVATION IS 18.00 FT NGVD BUT TRENCH DRAIN AT
 WEST DRIVEWAY TO ALLEYWAY HAS A GRATE ELEVATION OF
 18.10 FEET NGVD. FLOW WILL BUBBLE OUT OF THE TRENCH
 DRAIN WHEN THERE IS SUBSTANTIAL FLOW OVER THE WEIR.
  
 8. WHERE IS THE BACKFLOW VALVE TO BE INSTALLED (DETAIL
 ON SHEET C-10)?
  
 9. STORM DRAINAGE ANALYSIS IN THE SURFACE WATER
 MANAGEMENT REPORT:
 A. ASSUMES NO WEIR TO CONTROL WATER SURFACE ELEVATIONS
 B. PIPE VELOCITY BETWEEN STRUCTURES 1 AND 3 AND BETWEEN
 3 AND THE OUTFALL ARE EXCESSIVE (10 FEET PER SECOND).
 C. HGL ELEVATIONS ARE LOWER THAN PIPE INVERT
 ELEVATIONS.
  
 10. OPEN CUT TRENCH FOR WATER MAIN CONNECTION ON
 CHILLINGWORTH DRIVE WILL REQUIRE THE ROADWAY TO BE
 MILLED AND RE-SURFACED 50 FEET EACH SIDE OF THE TRENCH
 AND COMPLETE WIDTH OF TRAVEL LANE(S).
  
 WITH REGARDS,
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 CITY OF WEST PALM BEACH
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS ST., 4TH FLOOR
 WEST PALM BEACH, FL 33401
 PHONE: 561-494-1120
 FAX: 561-494-1116
 CELL 561-351-0510
 [email protected]
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved