Plan Review Notes
Plan Review Notes For Project E14030024
Project Number E14030024
Review Stop ENG-A
Sequence Number 1
Notes
Date Text
2014-03-10 11:06:33PASSED WITH PROVISO:
  
 #1 STAINLESS STEEL TAPPING SLEEVE IS NOT ALLOWED SINCE
 TAPPED LINE ONLY TWICE THE DIAMETER OF THE PROPOSED 4"
 PIPE.
 PLEASE USE A DUCTILE IRON SLEEVE. ON PAGE 19 OF 54 OF
 THE CITY'S APPROVED MATERIAL LIST YOU MAY FIND
 ACCEPTABLE PRODUCTS.
  
 #2 PLEASE SUBMIT AML PAGE 19 VIA EMAIL TO
 [email protected]
  
 #3 PLANS ARE BEING APPROVED "AS-NOTED"
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved