Notes
Date Text
2013-06-11 09:31:33PLEASE RESPOND TO COMMENTS IN WRITING.
  
 1. RIM ELEVATION (20.65) OF STORM MANHOLE IS LOWER THAN
 THE GRATE ELEVATION (21.48) OF ALL OF THE STORM INLETS.
 2. ELIMINATE THE CURB OPENING AROUND CATCH BASIN CB-1.
 DRIVEWAYS CAN PROVIDE FLOOD RELIEF IF THERE IS A STORM
 EVENT THAT WOULD EXCEED THE CAPACITY OF THE
 EXFILTRATION SYSTEM.
 3. TIE ROOF DRAINAGE DIRECTLY INTO THE DRAINAGE
 STRUCTURES, IF POSSIBLE.
 4. STORM SEWER PRECAST MANHOLE DETAIL (SHEET C-7) - USE
 CWPB'S DETAIL ST-3 FOR MANHOLE FRAME AND COVER INSTEAD
 OF CALLING OUT TOWN OF JUPITER'S.
 5. PARKING SPACE #14 APPEARS TO BLOCK PARKING SPACE #8.
 6. ONE-WAY SIGNS ON PARKER AVENUE AND SOUTHERN BLVD
 CANNOT GO IN THE LEVEL (UNRAISED) MEDIANS.
 7. ZOO SIGN WILL NEED TO BE RELOCATED IN THE PARKER
 AVE. RIGHT-OF-WAY.
 8. ADD CENTER LINE STRIPING IN THE PARKING LOT AT SOUTH
 DRIVEWAY.
  
 WITH REGARDS,
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 CITY OF WEST PALM BEACH
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS ST., 4TH FLOOR
 WEST PALM BEACH, FL 33401
 PHONE: 561-494-1120
 FAX: 561-494-1116
 CELL 561-351-0510
 [email protected]
2013-06-10 14:36:08PLEASE RESPOND TO COMMENTS IN WRITING:
  
 #1 DUMPSTER DETAIL MISSING.
  
 #2 SHEET C-3 REMOVE PAVER HATCH AT FDOT DRIVEWAY APRON.
 IT'S CONFUSING.
  
 #3 SHEET C-3 FDOT PERMIT REQUIRED FOR DRIVEWAY APPROACH
 AND ADA RAMP IN FDOT ROW.
  
 #4 SHEET C-3 CALL OUT 6" THICK CONCRETE DRIVEWAY
 APPROACH (3000PSI) AT PARKER AVENUE.
  
 #5 DUMPSTER PICK-UP MUST BE SPELLED OUT ON PLANS. WHO
 WILL ROLL OUT DUMPSTER AND WHERE WILL IT BE PLACED FOR
 PICK-UP.
  
 #6 SHEET C-2 DIMENSION ALL ADA RAMPS WIDTHS.
  
 #7 STATE ON PLANS NGVD 29 DATUM (ELEVATIONS).
  
 #8 MOVE DOMESTIC WATER TAP SO THAT WATER METER IS
 INSIDE 10' U.E. (TYPE K COPPER)
  
 #9 FIRE HYDRANT PIPE SHALL BE 6" DIP @ 36" DEEP.
  
 #10 SUBMIT A FDOT UTILITY APPLICATION PERMIT ALONG WITH
 2 SETS OF REVISED PLANS.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved