2016-04-04 17:37:51WATER:
  
 #1 WHERE PLANS CALL FOR 10IN.X8IN. CUT IN TEE NOTE PLAN
 TO REFERENCE "CONNECTE PER CITY DETAIL P-6 (TYP.)"
  
 #2 SHOW THE NEAREST INLINE VALVES IN 10IN. WM. SHOW
 EXISTING SERVICE CONNECTIONS, PFL CONNECTIONS, ETC. AS
 THESE WILL BE AFFECTED DURING SHUTDOWN TO FACILITATE
 CUT-IN TEE INSTALLATION.
  
 #3 PLANS CALL FOR PROPOSED 8IN. WM CROSSING LANDSCAPE
 BUFFER AND REMOVABLE WALL SECTION
 ADD NOTE IN 8IN. WM IN SLEEVE UNDER BERM & WALL IN..
 CALL OUT SIZE, MATERIAL, AND LENGTH OF SLEEVE. ADD A
 DETAIL OR PROFILE.
  
 #4 CALL OUT SAMPLE POINTS. ADD NEW DETAIL FOR SAMPLE
 POINT AT NEW FH IF NEEDED.
  
 #5 USE LATEST CITY STANDARD DETAILS. HTTP://WPBFL.US/DE
 PARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPL
 ICATIONS
  
 #6 CALL OUT LENGTH OF PIPE RESTRAINTS AT VALVES,
 FITTINGS, ETC.
  
 #7 AT CUL-DE-SAC ADD 8IN. INLINE VALVE BEFORE FH TEE
 AND HYDRANT VALVE. ADD AND CALL OUT 8IN.X6IN. REDUCER
 SHOW WATER SERVICE TAPS TO 8IN. WATERMAIN AND NOT
 HYDRANT RUN.
  
 #8 METER BOXES TO BE INSTALLED IN UE.
  
 #9 NOTE ON PLANS: "CONTRACTOR SHALL AVOID INSTALLING
 VALVES ON CURBLINE."
  
 #10 PROVIDE CALCS FOR WM SIZING (POD A AND FUTURE
 PHASES).
  
 #11 CALL OUT UTILITY CROSSING AND TOP ELEV AND VERTICAL
 CLEARANCE.
  
 #12 BETWEEN CONG-3-P6 AND CONG-1-16
 CALL OUT HORIZONTAL & VERTICAL CLEARANCE W/ EXIST WM.
 PLAN SHOWS 2FT. SEPARATION?
 IF DEFLECTION/OFFSET OF EXIST WM IS REQUIRED, ADD 1)
 UTILITY CROSSING DETAIL AND 2) WM DEADEND
 RESTRAINT DETAIL.
  
 #13 CONFLICT W/ EXIST 10IN. WM:
 CONG 1-P6, CONG-2, CONG-3-P6
 MOVE STRUCTURE CONG-2 WEST TO PROVIDE 5FT.MIN
 SEPARATION.
  
 #14 UTILITY CROSSING BETWEEN PROPOSED STORM & EXIST
 10IN. WM AT STA 267+80.
 CALL OUT VERTICAL CLEARANCE; IF DEFLECTION/OFFSET OF
 EXIST WM IS REQUIRED, ADD 1) UTILITY CROSSING DETAIL
 AND 2) WM DEADEND
 RESTRAINT DETAIL
  
 #15 UTILITY CONFLICT AT CONG-5 & 10IN. WM?
 CALL OUT VERTICAL CLEARANCE;
 IF DEFLECTION/OFFSET OF EXIST WM IS REQUIRED, ADD 1)
 UTILITY CROSSING DETAIL AND 2) WM DEADEND
 RESTRAINT DETAIL
  
 SEWER:
  
 #1 USE LATEST CITY STANDARD DETAILS. HTTP://WPBFL.US/DE
 PARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPL
 ICATIONS
  
 #2 PROVIDE CALCS FOR LIFT STATION DESIGN (POD A AND
 FUTURE PHASES) PROVIDE CALCS FOR FM SIZING (POD A AND
 FUTURE PHASES)
 SHOW FM PROFILE
 USE PVC/C900 FOR SAN SEWER EXCEEDING 10FT. DEPTH
 INCLUDE NEW LS STANDARD DETAILS
 (CONTRACTOR TO SUBMIT BYPASS PUMPING PLAN)
 CALL OUT UTILITY CROSSING AND TOP ELEV AND VERTICAL
 CLEARANCE
 CCTV OF NEW SANITARY SEWER SYSTEM WILL INCLUDE SAN
 SEWER LATERALS
 CLEAN-OUTS TO BE INSTALLED IN UE
  
 #3 STA. 272+55, +70FT. RT AND +50FT. LT:
 CALL OUT TOP ELEV FOR 4IN. - 45DEGREE BENDS
 MODIFY NOTE TO READ (FORCE MAIN IN DIP SLEEVE UNDER
 BERM & WALL). CALL OUT SIZE, MATERIAL, AND LENGTH OF
 SLEEVE. ADD DETAIL.
 SHOW PROFILE OF (2) 4IN. HDPE FMS THAT ARE TO BE
 INSTALLED VIA HDD
 CALL OUT SIZE, MATERIAL, AND LENGTH PIPE SECTIONS TO BE
 INSTALLED BY OPEN CUT CONNECTING THE HDPE HDD FMS. CALL
 OUT FITTINGS & TOP ELEV AT CONNECTIONS B/W HDPE &
 PVC/C900 OPEN CUT FM. ADD DETAIL FOR TRANSITION FROM
 HDPE TO PVC/C900
  
 #4 STA. 272+55 TO 265+47
 CALL OUT MIN. HORIZONTAL SEPARATION OD TO OD BETWEEN
 PROPOSED 4IN. HDPE FM AND EXIST STORM
 (5FT. MIN OD TO OD).
  
 #5 PROPOSED ARV MH:
 TO BE INSTALLED AT ACTUAL HIGH POINT LOCATION, NOTE ON
 PLANS "TO BE FIELD DETERMINED".
  
 #6 LABEL EXIST 6IN. SAN LATERAL.
  
 #7 LABEL EXIST 12IN. SAN SEWER.
  
 #8 PROPOSED FM TO BE INSTALLED VIA HDD WITH MAX DEPTH
 OF 6FT. THROUGHOUT.
  
 #9 NEED DETAIL FOR FM ENTERING EXIST MH. REHAB SAN MH.
 INSTALL INSIDE DROP BOWL. ADD INSIDE DROP DETAIL. ADD
 (2) BURIED ELECTRIC CONDUITS/BUNDLE(?) NORTH OF EXIST
 SAN MH. POSSIBLE CONFLICTS W/PROPOSED 6IN. FM. ADD NOTE
 "CONTRACTOR TO PERFORM SOFTDIGS PRIOR TO FM
 INSTALLATION"
 PROVIDE ADDITIONAL FLOW TO GRAVITY SYSTEM (POD A AND
 FUTUTURE FLOWS)
 HTTP://WWW.RELINER.COM/DROPBOWL/INDEX.HTM
  
 #10 EXIST LS77 MODIFY CAPTION TO READ "SYSTEM INFO FOR
 REFERENCE ONLY (NOT ASBUILTS)".
 NOTE "CONTRACTOR TO FIELD VERIFY EXISTING PIPE
 CONFIGURATION".
  
 #11 48IN. PCCP FM - CALL OUT PIPE MATERIAL AS PCCP
 (PRESTRESSED CONCRETE CYLINDER PIPE)
  
 LAURA LE, P.E. CITY OF WEST PALM BEACH
 PUBLIC UTILITY ENGINEER
 [email protected]
 561-494-1093 DIRECT LINE
 561-289-8414 CELL
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved