2013-06-11 20:20:56PLEASE RESPOND TO COMMENTS IN WRITING:
  
 #1 STRIPING DETAIL MUST MATCH CITY'S REQUIREMENT FOR
 PARKING. DETAIL 1 IS MISSING 2' DIMENSION TO WHEEL
 STOP.
 FDOT DETAIL 17346 SHOULD NOT BE SHOWN AS IT CONFLICTS
 WITH CITY OF WPB STANDARD.
  
 #2 SHOW WATER METER LOCATION AND BACKFLOW LOCATION.
 WHAT SIZE IS THE CURRENT METER AND BACKFLOW.
  
 #3 PROVIDE VERTICAL CLEANRANCE BETWEEN WATER AND STORM.
 STATE MINIMUM CLEARANCE.
  
 #4 PARKING 16' IN LENGTH IS CONSIDERED COMPACT? PARKING
 MUST BE DESIGNATED AS SUCH VIA SIGN.
  
 #5 SRUVEY ELEVATIONS IS USING NGVD 1988 DATUM VS NGVD
 1929.
  
 #6 PROVIDE LOCATION OF SEWER CLEAN-OUT. IF ONE IS NOT
 PRESENT PLEASE INDICATE A PROPOSED ONE ON THE PLAN.
  
 #7 DRIVEWAY APRONS DO NOT REFLECT CONCRETE
 CONSTRUCTION. CONTACT FDOT FOR DRIVEWAY APRON
 SPECIFICATIONS AND PERMITTING.
  
 #8 BACKFLOW DETAIL IS MISSING
  
 #9 PLANS SHOW TWO SHEEL STOPS DETAILS C-5 AND C-10,
 ALSO ADA DETEACTABLE RAMP DETAILS ARE SHOWN TWICE C-5
 AND C-9.
  
 #10 LOCATION FOR BOLLARDS ARE NOT SHOWN. BOLLARDS NEED
 REFLECTIVE TYPE TAPE AND IT IS RECOMMENDED THAT THEY BE
 PLACED INSIDE OF A CURBED AREA WHERE DAMAGE TO VEHICLES
 DRIVING BY THEM IS LIMITED.
  
 STORM WATER COMMENTS CONTINUE BELOW.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 STORM WATER / SITE
  
 S&S 3/4/2013) AND DRAINAGE CALCULATIONS (DATED
 2/25/2013):
 DRAINAGE CALCULATIONS:
 1. SURFACE WATER MANAGEMENT ELEMENTS PAGE -
 STAGE-STORAGE DESCRIPTIONS LIST ELEVATIONS AS NAVD. THE
 ELEVATION VERTICAL DATUM NEEDS TO REFERENCE NGVD 1929.
  
 2. PEAK STAGES LISTED FOR THE 3-DAY STORM EVENTS DO NOT
 MATCH THE MODELING RESULTS.
  
 3. EXFILTRATION TRENCH CALCULATIONS
 A. H2 SHOULD EQUAL 7.9 FEET (= MIN. GRATE ELEV. MINUS
 BOTTOM OF TRENCH ELEVATION) NOT 9 FEET.
 B. TRENCH VOLUME PROVIDED IN 100 LF OF TRENCH (9.17
 AC-IN) INCORRECTLY CONVERTED TO AC-FT (5.96 AC-FT).
  
 4. HYDROLOGIC/HYDRAULIC MODELING
 A. VERIFY STAGE-STORAGE PER COMMENT 3.B ABOVE.
 B. FOR 25-YEAR AND 100-YEAR 3-DAY MODELS, THE TOTAL
 RAINFALL AT HOUR 72 IS CONSIDERABLY LESS THAN THE
 RAINFALL SHOWN ON THE ISOHYETAL RAINFALL MAPS.
  
 PLANS:
 1. CAN THE EXFILTRATION TRENCH BE BETWEEN STRUCTURES 1
 AND 2 INSTEAD OF BETWEEN STRUCTURES 2 AND 2? CURRENT
 LOCATION OF TRENCH IS NEXT TO LANDSCAPE BUFFER
 CONTAINING TREES.
  
 2. EXISTING GUMBO LIMBO TREE MAY BE IMPACTED BY THE
 CONSTRUCTION OF THE EXFILTRATION TRENCH ALONG THE NORTH
 SIDE OF THE SITE.
  
 3. THERE APPEARS TO BE A 2:1 SLOPE FOR THE LANDSCAPE
 BUFFER NORTH OF THE NORTHEAST DRAINAGE STRUCTURE.
  
 WITH REGARDS,
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 CITY OF WEST PALM BEACH
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS ST., 4TH FLOOR
 WEST PALM BEACH, FL 33401
 PHONE: 561-494-1120
 FAX: 561-494-1116
 CELL 561-351-0510
 [email protected]
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved