| Plan Review Notes For Project E13030024 |
| Project Number |
E13030024 |
|
| Review Stop |
ENG-A |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-05-31 15:27:38 | PASSED WITH PROVISOS: | | | | | | #1 PAVEMENT RESTORATION LIMITS WILL BE SET FORTH BY | | | CITY OF WPB ROW DIVISION | | | | | | #2 CONTRACTOR SHALL SUBMIT ROW APPLICATION FOR USE OF | | | THE ROW AND FOR WORK WITHIN ROW. | | | THIS WILL INCLUDE MOT (CERTIFIED MAINTENANCE OF TRAFFIC | | | PLAN) | | | | | | #3 REPLACEMENT OF FIRE HYDRANT WILL BE REQUIRED AT THE | | | CORNER OF SAPODILLA AND EVERNIA. | | | | | | #4 EXISTING WATER SERVICES WILL BE CAPPED AT MAIN. | | | | | | #5 MANHOLE DOWNSTREAM OF SEWER CONNECTION WILL REQUIRE | | | REHABILITATION AS DETERMINED BY CITY'S OPERATION AND | | | MAINTENANCE. | | | | | | #6 ANY DAMAGED ROW ELEMENT WILL BE RESTORED TO EQUAL OR | | | BETTER CONDITION. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
| |
Print |
|