Plan Review Notes
Plan Review Notes For Project E13030023
Project Number E13030023
Review Stop ENG-A
Sequence Number 1
Notes
Date Text
2013-05-31 15:31:38PASSED WITH PROVISOS:
  
 #1 NOTED ON PLANS IS A 4" PVC FM LINE THAT CROSSES
 WATERMAIN,
 OBTAIN PROPER VERTICAL COVERAGE AND PROVIDE CONFLICT
 ELEVATIONS ON AS-BUILTS.
  
 #2 DATUM MUST BE NGVD 29 FOR AS-BUILTS.
  
 #3 DO NOT USE 6" TAPP, USE INSTEAD VALVE CUT-IN METHOD
 USING A 6" X 6" TEE.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved