| Plan Review Notes For Project E13030023 |
| Project Number |
E13030023 |
|
| Review Stop |
ENG-A |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-05-31 15:31:38 | PASSED WITH PROVISOS: | | | | | | #1 NOTED ON PLANS IS A 4" PVC FM LINE THAT CROSSES | | | WATERMAIN, | | | OBTAIN PROPER VERTICAL COVERAGE AND PROVIDE CONFLICT | | | ELEVATIONS ON AS-BUILTS. | | | | | | #2 DATUM MUST BE NGVD 29 FOR AS-BUILTS. | | | | | | #3 DO NOT USE 6" TAPP, USE INSTEAD VALVE CUT-IN METHOD | | | USING A 6" X 6" TEE. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING |
| |
Print |
|