2013-06-05 07:49:59PROVISOS:
  
 #1 FIRELINE CONNECTION IS APPROVED WITH THE CONDITION
 THAT IF IT IS NOT FEASIBLE TO CONNECT TO EXISTING
 FIRELINE STUB THEN A NEW TAP MUST BE MADE AT MAIN.
  
 #2 FOR CONSTRUCTION PLEASE ADD CITY OF WPB STANDARD
 DETAILS - FOR SIDEWALKS, CURB, PRESSURE PIPE RESTRAINT,
 WATER METER WS-1,
  
 #3 OWNER WILL NEED TO GRANT THE CITY A SIDEWALK
 EASEMENT ALONG BANYAN BLVD. (CONTACT VINCENT NOEL, CITY
 PROPERTY MANAGER (561) 494-1096)
  
 #4 PLEASE PROVIDE A 6" CURB ALONG YOUR WEST AND EAST
 PROPERTY LINE. LANDSCAPE AREAS MUST BE CONTAINED.
  
 #5 CONTRACTOR FOR THE PROJECT MUST OBTAIN A
 RIGHT-OF-WAY PERMIT TO PERFORM UTILITY WORK / SIDEWALK
 / DRIVEWAYS / ALLEYWORK.
 (LIMITS OF PAVEMENT REPLACEMENT WILL BE IMPOSED BY THE
 RIGHT-OF-WAY PERMIT CONDITIONS.)
  
 #6 PUBLIC FIRE HYDRANT SERVING FDC MAY NEED
 REPLACEMENT. THIS WILL BE DETERMINED BY CITY OF WPB
 OPERATIONS AND MAINTENANCE DEPT.
  
 #7 ZONING CONDITIONS MUST BE MET PRIOR TO PERMIT
 CLOSURE.
  
 #8 AS-BUILTS AND ENGINEER-OF-RECORD CERTIFICATION WILL
 BE REQUIRED PRIOR TO C.O.
  
 #9 ADA PATH TO ALLEY SHOULD BE SIGNED TO ADVICE OF
 ALLEY TRAFFIC. IT SHOULD ALSO PROVIDE A FLAT 5' X 5'
 LANDING AREA. AREA MUST BE PROPERLY LIGHTED.
  
 #10 ONCE METER AND FIRELINE VALVES ARE INSTALLED
 PROVIDE A SKETCH AND LEGAL FOR EASEMENT TO THE CITY OF
 WEST PALM BEACH.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved