2012-07-30 12:14:29PLEASE RESPOND TO ALL COMMENTS IN WRITING:
 1. EXISTING DRIVEWAY APRONS MUST BE REMOVED AND AREAS
 RESTORED TO GRASS MEDIAN AND PROPER CURB.
 SHOW LOCATIONS. CITY STANDARD APRON DETAILS, SIDEWALK,
 CURB MUST BE INCLUDED IN PLANS, SEE LINK BELOW.
 AN OFFSITE PLAN MAY BE REQUIRED SHOWING EXTENTS OF
 PAVEMENT REPLACEMENT DUE TO ALL CITY CONNECTIONS AND
 DRIVEWAY REMOVALS.
 HTTP://WWW.WPB.ORG/ENGINEERING/ENG_STANDARDS.HTM
 2. ROW PERMIT WILL BE REQUIRED BY CONTRACTOR TO PERFORM
 APRON WORK AND SEWER/WATERMAIN TIE-INS. SEE LINK BELOW
 TO ACCESS ROW PERMIT APPLICATION.
 HTTP://WWW.WPB.ORG/ENGINEERING/ENG_FORMS.PHP
 EXISTING FIRELINE STUB NEEDS TO BE UTILIZED CUT AND
 CAPPED AT WATERMAIN. WOULD SUGGEST UTILIZING FOR A
 WATER SERVICE TO ASHLEY STORE OR FUTURE BUILDING.
 LOCATION OF PROPOSED WATER AND SEWER NEEDS TO BE SHOWN
 WITHOUT DOUBT AS TO LOCATION FROM MEP.
 3. PROVIDE UNITY OF TITLE DOCUMENT. MAY PDF TO
 [email protected]
 4. FUTURE 4,500 SF RETAIL BUILDING DOES NOT SHOW
 DUMPSTER AREA.
 5. WATERMAIN SHOWN ON-SITE MUST BE PRIVATE. CITY WILL
 NOT OWN ANY WATERMAINS ONSITE. WATER LINE FOR ONSITE
 FIRE HYDRANTS MUST HAVE DCDA AT PROPERTY LINE.
 6. (2) PROPOSED SEWER SERVICES SHOW CROSSING EXISTING
 CITY WATERMAIN. SPECIFY CLEARANCE.
 7. A CLEAN-OUT IS REQUIRED BEFORE SEWER LINE (LATERAL)
 ENTERS BUILDING.
 8. SHARED UTILITY AGREEMENT AND ACCESS AGREEMENT MUST
 BE IN PLACE. IF ONE OWNER THAN NOT REQUIRED.
 9. EXISTING SEWER LATERAL FOR GOLD?S GYM MUST BE
 LOCATED AND CUT AND CAPPED AT MAIN.
 10. VERIFY PARKING SPACE DETAIL AND HC SPACE DETAIL
 THAT MUST MATCH PLANNING AND ZONING REQ UIREMENT.
 11. NOTES ON SHEET C1 CALL FOR PVC PIPE FOR WATERMAINS,
 CITY WILL NOT ACCEPT PVC FOR CITY OWNED WATERMAINS.
 12. NO IRRIGATION METERS SHOWN, IT IS SUGGESTED THAT
 YOU INSTALL ONE TO SAVE SEWER FEES.
 13. FDC MUST BE 150? MAX LENGTH FROM A CITY FIRE
 HYDRANT, A CITY FIRE HYDRANT MUST BE INSTALLED AT PALM
 BEACH LAKES BLVD ROW TO MEET YOUR DISTANCE.
 14. STOP SIGNS AT LOCATIONS EXITING OUT TO PALM BEACH
 LAKES SERVICE DRIVE MUST ALSO DISPLAY RIGHT-TURN ONLY
 TO AVOID TRAFFIC TURNING LEFT UNTO ONE-WAY TRAFFIC.
 ADDITIONAL ONE-WAY SIGNS MAY BE REQUIRED TO GUIDE
 TRAFFIC.
 15. PROVIDE STORM WATER CALCULATIONS.
  
 DRAINAGE
 ASHLEY FURNITURE (2121 PALM BEACH LAKES BLVD.)
 CIVIL PLANS BY SUNTECH ENGINEERING
 1. DRAINAGE STRUCTURES NUMBERS 2 AND 9 USED TWICE.
 2. AT CONTROL STRUCTURE NO. 9, THE VERTICAL DROP FROM
 THE SIDEWALK TO THE EDGE OF PAVEMENT IS NEARLY 1'.
 3. IS IT THE INTENT OF THE EOR FOR THE 10' GRASS STRIP
 DEPICTED ON SECTION A-A TO HOLD WATER ( BOTTOM
 ELEVATION = 14.75; GRATE ELEVATION = 15.50)?
 4. THE PRB DETAIL SHOULD SHOW THE BAFFLE CLOSED ON TOP
 AND OPEN ON THE BOTTOM.
 5. SHOW VERTICAL CLEARANCES WHERE THE WATER MAINS CROSS
 THE STORM SEWER SYSTEM.
 6. WATER QUALITY CALCULATIONS DO NOT INCLUDE A SAFETY
 FACTOR OF 2 FOR EXFILTRATION TRENCHES.
 7. EXFILTRATION TEST RESULTS ARE NEEDED WITH THE WATER
 QUALITY CALCULATIONS.
 8. PARKING SPACE DETAIL SHOWS 20' PARKING SPACE.
 SECTIONS SHOW PARKING SPACES OF 16' TO 19.5'
  
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved