2012-05-30 08:10:26STORMWATER COMMENTS: PLEASE RESPOND IN WRITING.
  
 I REVIEWED THE DRAINAGE CALCULATIONS AND DESIGN PLANS
 FOR THE SUBJECT PROJECT AND OFFER THESE COMMENTS:
 1. DRAINAGE CALCULATIONS DO NOT LIST THE EXISTING LAND
 USES (PAVEMENT, LAKE, PERVIOUS, ETC.). A PORTION OF THE
 LAKE IS BEING FILLED BUT THE POST-DEVELOPMENT PEAK
 STAGES AND PEAK DISCHARGE RATES ARE LESS THAN THE
 REPORTED EXISTING PEAK STAGES AND PEAK DISCHARGE RATES.
 2. IN THE CASCADE MODEL, GROUND STORAGE IS LISTED AS
 3.75 INCHES COMPARED TO THE CALCULATED SOIL STORAGE OF
 3.55 INCHES. CORRECTING THIS IN THE CASCADE MODEL WILL
 HAVE A NEGLIGIBLE IMPACT ON THE RESULTS.
 3. MATCH LINES ON SHEETS PD-3 AND PD-4 MISLABELED.
 4. WHAT IS THE PURPOSE OF THE ROCK TRENCH? THE PIPE
 INVERT ELEVATIONS FOR THE 15" PHDPE ARE BELOW THE
 CONTROL ELEVATION OF THE LAKE CONTROL STRUCTURE. THESE
 PIPES WILL BE NEARLY HALF FULL OF WATER MOST OF THE
 TIME.
 5. THE PROPOSED LAKE BANK AT THE NORTHWEST CORNER OF
 THE SOCCER/LACROSSE/FOOTBALL FIELD APPEARS TO HAVE A
 SLOPE OF 3:1 (TOP OF BANK ELEVATION = 17.60 FT NGVD;
 WATER ELEVATION = 14.39 FT NGVD; HORIZONTAL DISTANCE =
 10'+/-).
 6. THERE DOESN'T APPEAR TO BE A PERIMETER BERM AT
 ELEVATION 18.5 FT NGVD ALONG THE WEST AND SOUTH
 BOUNDARIES.
 7. A FEW OF THE NOTES ON SHEET PD-5 REFERENCE VILLAGE
 OF WELLINGTON.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DIVISION
 401 CLEMATIS ST., 4TH FLOOR
 WEST PALM BEACH, FL 33401
 PHONE: 561-494-1120
 FAX: 561-494-1116
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved