E12030006 |
|
| Review Stop |
ENG-A |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-04-18 15:01:46 | PLAN IS ACCEPTABLE BUT HAS BEEN APPROVED AS-NOTED. | | | | | | TAPPING VALVE AND SLEEVE CALLED OUT | | | | | | CONCRETE SIDEWALK REPLACEMENT | | | | | | CORRECT VALVE COVER DESIGNATED | | | | | | BACKFLOW SETBACK 18" FROM PROPERTY LINE. | | | | | | CORRECTED AML (APPROVED MATERIAL LIST) | | | CORRECTED 6X4 TAP (NOT STAINLESS) | | | CALLED OUT RWGV | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | |
| |