| 2011-05-11 15:24:04 | WATER AND SEWER SHEET REVISION WAS DONE TO AVOID A | | | CONFLICT. | | | MODIFICATION REVIEW PASSED WITH THE FOLLOWING PROVISOS: | | | | | | #1 PLAN MUST BE APPROVED BY PALM BEACH COUNTY ROADWAY | | | DEPT PRIOR TO CONSTRUCTION. | | | | | | #2 CONTRACTOR SHALL FOLLOW INSTRUCTION ON PLAN TO | | | ENSURE WM IS RESTRAINT PROPERLY. | | | | | | #3 PALM BEACH COUNTY HEALTH DEPARMENT WILL ACCEPT | | | CHANGE AND WILL REQUIRE AS-BUILT REVIEW PRIOR TO PBC | | | HEALTH DEPT RELEASE. | | | | | | #4 ONCE PALM BEACH COUNTY ROADWAY APPROVES PLAN FOR THE | | | WORK CONTACT CONSTRUCTION COORDINATOR - DAVID MCKENZIE | | | (561) 644-7342 | | | SO THAT CONTRACTOR PROCEEDS TO SCHEDULE WORK. REMEMBER | | | 48 HOURS NOTICE IS THE MINIMUM ALLOWED TIME FOR | | | SCHEDULING WORK WITH CWPB ENGINEERING. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | | | | |
| |
Print |
|