2011-02-15 14:11:21ENGINEERING SERVICES REVIEW COMMENTS:
  
 #1 REVIEW CONSISTS OF AVAILABILITY OF WATER AND SEWER
 FOR THE RUBBER DUCKY CAR WASH.
 -EXISTING WATER SERVICE HAS BEEN DETERMINED TO BE
 INADEQUATE AS TO THE DEMAND CALCULATED AND SUBMITTED BY
 ENGINEER OF RECORD.
 -EXISTING SEWER SERVICE HAS BEEN DETERMINED TO BE
 INADEQUATE AS TO THE DEMAND AND STANDARD REQUIRED BY
 CITY OF WEST PALM BEACH IMPOSED ON IMPACT OF NEW
 DEVELOPMENT.
  
 #2 SIDEWALKS AND ENTRANCE DRIVES WILL REMAIN IN THE
 SAME LOCATION. ANY PORTION OF WORK REQUIRING ANY CHANGE
 SHALL BE SUBMITTED FOR PERMIT TO THE FDOT OFFICE. THESE
 WILL ALSO CONSTITUTE A REVISION WITH THE ENGINEERING
 DEPARTMENT AND/OR PLANNING DEPARTMENT.
  
 #3 ENGINEERING DEPARTMENT HAS BEEN IN CONTACT WITH THE
 OWNER AND OR ENGINEER TO DETERMINE HOW TO BEST SERVE
 THE PROPERTY. UPON RECEIVING INFORMATION ON FLOW IT WAS
 DETERMINED BY CITY STAFF THAT A MINIMUM OF 2" SERVICE
 LINE WOULD BE REQUIRED. UPON RECEIVING THE FDOT
 DOCUMENTATION FROM THE EOR THE FOLLOWING COMMENTS WHERE
 GENERATED VIA E-MAIL, PLEASE SUBMIT:
 -ENGINEER'S COST ESTIMATE FOR THE WORK **
 -SURETY. - THIS ESTIMATE MUST ACCOMPANY PERMIT ALONG
 WITH PROPER SURETY (110% OF THE COST OF CONSTRUCTION
 (FORMS WHERE ATTACHED).
 -SHOW AND INCLUDE SEWER UPGRADE. THIS WOULD INCLUDE A
 NEW 6" SEWER LATERAL FROM THE MAIN TO THE PROPERTY
 LINE. YOU HAVE IN PLACE AN OLD 4" CAST-IRON THAT WILL
 NOT SUFFICE YOUR DEVELOPMENT."
  
 #4 DRAINAGE SURFACE: EOR SUGGESTED USING A PERVIOUS
 TYPE CONCRETE SURFACE HOWEVER THIS TYPE PRODUCT IS NOT
 RECOGNIZED AS A FINISHED SURFACE PRODUCT BY THE CITY OF
 WEST PALM BEACH.
  
 #5 PROVIDE SOUTH FLORIDA WATER MANAGEMENT APROVAL FOR
 SITE.
  
 #6 WATER WELL SYSTEM MUST HAVE PROPER VALVING AND
 BACKFLOW PREVENTION WHEN TIDE INTO CITY POTABLE WATER
 SERVICE. PLEASE PROVIDE A DETAIL ON THE PLANS WHERE
 THIS CONNECTION WILL BE MADE. AN AIR GAP MAY NEED TO BE
 PROVIDED BETWEEN THE TWO. SUBMIT SFWMD PERMIT APPROVAL
 AND FLOW CAPACITY INFORMATION.
  
 #7 A QUOTE FOR SERVICES WILL BE PROVIDED UPON APPROVAL
 OF POTABLE WATER SIZE. CONTRACTOR IS TO CONNECT SERVICE
 AT HIS EXPENSE.
  
 #8 ** SUBMIT A CERTIFIED COST ESTIMATE FOR ALL SITE
 DEVELOPMENT INFRASTRUCTURE. THIS DOCUMENT IS A
 REQUIREMENT OF YOUR SUBMITTAL TO ENGINEERING SERVICES
 DEPARTMENT.
 HTTP://WWW.CITYOFWPB.COM/ENGINEERING/ENG_FORMS.PHP
 "AUTOCALC CERTIFIED COST ESTIMATE"
  
 #9 SURETY FOR INFRASTRUCTURE ELEMENTS WILL APPLY IF ANY
 WORK IN THE ROAD R.O.W. IS PERFORMED.
  
 PLEASE RESPOND TO ALL COMMENTS IN WRITING AND REVISE
 PLANS ACCORDINGLY.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  
  
  
  
  
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved