Plan Review Notes For Project E10100008
Project Number E10100008
Review Stop ENG-A
Sequence Number 1
Notes
Date Text
2010-11-03 08:50:3511/03/2010
 SPOKE TO KUSHALA GOWDA - MALCOLM-PIRNIE 1-954-414-9001
 UTILITY JURISDICTION PERMITTING REVIEW
 AMOUNT PAID $515.00 TO CITY OF WPB ESD
  
 PROPOSED PPP AND CONSTRUCTION SEQUENCE PLAN ON-FILE.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
2010-11-01 09:02:31PASSED WITH PROVISOS:
  
 STORMWATER POLLUTION PREVENTION PLAN
 A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
 (NPDES) STORMWATER PERMIT IS REQUIRED FOR YOUR SITE
 UNDER RULE 62-621.300(7) (A) OF THE FLORIDA
 ADMINISTRATIVE CODE (F.A.C.). A COPY OF THIS PERMIT
 REQUIREMENTS AND FURTHER INFORMATION CAN BE FOUND AT
 THE FDEP WEBSITE
 (WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES).
 HTTP://WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/DOCS/
 SWPPPTEMPLATE.PDF
  
 IN ORDER TO PROVIDE CONSISTENCY IN THE PREPARATION,
 REVIEW AND IMPLEMENTATION OF A SWPPP, PLEASE REVIEW THE
 FOLLOWING ITEMS.
 THESE COMMENTS WILL BE PART OF YOUR PROJECT COMPLIANCE
 WITH THE REQUIREMENTS OF THE FLORIDA STATUTE THAT
 GOVERNS THE PERMIT.
  
 THE DESIGN ENGINEER SHOULD INCLUDE THE FOLLOWING:
 SEQUENCE OF SOIL DISTURBING ACTIVITIES
 1.THE INTENDED SEQUENCE OF THE SOIL DISTURBING
 ACTIVITIES WITH DESCRIPTION OF EACH SOIL DISTURBING
 ACTIVITIES
 2. FOR THIS SECTION, PROVIDE THE PHASING OF
 CONSTRUCTION. IN THE EVENT THE CONTRACTOR CHANGES IT,
 THE CONTRACTOR WILL BE RESPONSIBLE FOR UPDATING THIS
 SECTION AS WELL.
  
 STABILIZATION
 THERE ARE TWO TYPES OF STABILIZATION PRACTICES THAT
 SHOULD BE ADDRESSED:
 1. TEMPORARY STABILIZATION - SHOULD BE USED WHEN AN
 AREA IS GOING TO BE REWORKED SEVERAL TIMES DURING THE
 LIFE OF THE CONSTRUCTION PROJECT.
 2. PERMANENT STABILIZATION - SHOULD BE IDENTIFY THE
 METHOD THAT WILL BE USED TO STABILIZE ALL AREAS WITHIN
 THE PROJECT LIMITS THAT WERE CLEARED AND GRUBBED AT THE
 START OF CONSTRUCTION.
  
 OFF-SITE VEHICLE TRACKING AND DUST CONTROL
 1. THE CONTRACTOR SHALL TAKE MEASURES TO INSURE THE
 CLEANUP OF SEDIMENTS THAT HAVE BEEN TRACKED BY VEHICLES
 OR HAVE BEEN TRANSPORTED BY WIND OR STORMWATER ABOUT
 THE SITE OR ONTO NEARBY ROADWAYS.
 2. YOUR EROSION CONTROL DETAILS DO NOT SHOW A
 STABILIZED CONSTRUCTION ENTRANCE OR WASH-DOWN AREA
 DETAIL. THIS SHALL BE IMPLEMENTED IN ORDER TO REDUCE
 OFF-SITE TRACKING.
 3. LOADED HAUL TRUCKS SHALL BE COVERED WITH TARPAULIN.
 EXCESS DIRT ON THE ROAD SHALL BE REMOVED DAILY.
 4. PROVIDE LOCATIONS WHERE VEHICLES ENTER OR EXIT THE
 SITE.
 5. THE CONTRACTOR SHALL INITIATE REPAIRS WITHIN 24
 HOURS OF INSPECTIONS THAT INDICATE ITEMS ARE NOT IN
 GOOD WORKING ORDER.
 6. IF INSPECTIONS INDICATE THAT THE INSTALLED
 STABILIZATION AND STRUCTURAL PRACTICES ARE NOT
 SUFFICIENT TO MINIMIZE EROSION, RETAIN SEDIMENT, AND
 PREVENT DISCHARGING POLLUTANTS, THE CONTRACTOR SHALL
 PROVIDE ADDITIONAL MEASURES, AS APPROVED BY THE
 ENGINEER.
  
 WASTE DISPOSAL
 1. THE CONTRACTOR SHALL DEMONSTRATE THE PROPER DISPOSAL
 OF ALL CONSTRUCTION WASTE GENERATED WITHIN THE PROJECT
 LIMITS. WASTE MAY INCLUDE, BUT NOT BE LIMITED TO,
 VEGETATION FROM CLEARING AND GRUBBING ACTIVITIES,
 PACKAGING MATERIALS, SCRAP BUILDING MATERIALS, LITTER
 FROM TRAVELING PUBLIC, SEWAGE FROM SANITARY FACILITIES,
 HERBICIDES AND PESTICIDES AND THEIR CONTAINERS, AND
 HYDROCARBON PRODUCTS. CONTRACTOR SHALL DESIGNATE A
 WASTE COLLECTION AREA ONSITE AND DELINEATE THE AREA ON
 THE SWPPP SITE MAP.
 2. SANITARY/SEPTIC FACILITIES SHALL BE PROVIDED AND
 MAINTAINED IN A NEAT AND SANITARY CONDITION, FOR THE
 USE OF THE CONTRACTOR'S EMPLOYEES AS NECESSARY TO
 COMPLY WITH THE REQUIREMENTS AND REGULATIONS OF THE
 STATE AND LOCAL BOARDS OF HEALTH. A LICENSED SANITARY
 WASTE MANAGEMENT CONTRACTOR AS REQUIRED BY STATE
 REGULATIONS WILL COLLECT ALL SANITARY WASTE FROM
 PORTABLE UNITS.
 3. THE CONTRACTOR WILL PROVIDE LITTER CONTROL AND
 COLLECTION WITHIN THE PROJECT LIMITS DURING
 CONSTRUCTION ACTIVITIES. CONTRACTOR WILL PROVIDE AN
 ADEQUATE NUMBER OF LITTER CONTAINERS WITH LIDS AT THE
 STAGING, STOCKPILE AND FIELD OFFICE AREAS. WASTE
 COLLECTION WILL BE SCHEDULED SO THAT CONTAINERS ARE
 EMPTIED PRIOR TO OVERFLOW. SPILLED LITTER CONTAINERS
 WILL BE CLEANED UP IMMEDIATELY.
  
 NON-STORMWATER DISCHARGES
 1. PLEASE CONSIDER CONSTRUCTION ACTIVITIES THAT MIGHT
 GENERATE NON-STORMWATER DISCHARGES. INCLUDE A STATEMENT
 THAT REQUIRES THE CONTRACTOR TO PROVIDE AN EROSION
 CONTROL PLAN TO ADDRESS THE ACTIVITY.
 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP A
 DEWATERING SYSTEM THAT PROVIDES PRETREATMENT OF
 EFFLUENT PRIOR TO DISCHARGE INTO ADJACENT SURFACE
 WATERS. THE CONTRACTOR'S DEWATERING METHOD MUST MEET
 ALL LAWS (FEDERAL, STATE, AND LOCAL) RULES AND
 REGULATIONS CONCERNING THIS PRACTICE, INCLUDING THE USE
 OF PERMITTED OUTFALL STRUCTURES. IT IS THE CONTRACTOR'S
 RESPONSIBILITY TO COORDINATE AND APPLY FOR A DEWATERING
 PERMIT WITH THE APPROPRIATE WATER MANAGEMENT DISTRICT.
 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DESIGNATE
 AN AREA WITHIN THE PROJECT LIMITS FOR CONCRETE TRUCK
 WASHOUT ACTIVITIES. THIS AREA SHALL PROVIDE EROSION
 CONTROL DEVICES THAT PREVENT CONTACT BETWEEN CONCRETE
 WASHOUT MATERIALS AND STORMWATER AND/OR SURFACE WATERS.
 4. IF CONTAMINATED SOIL OR GROUNDWATER IS ENCOUNTERED
 DURING CONSTRUCTION, THE CONTRACTOR IS TO CEASE
 OPERATIONS IN THAT AREA AND CONTACT PROPER AUTHORITIES.
  
 CONTRACTOR SUBMITTAL
 PLEASE HAVE CONTRACTOR PROVIDE THE FOLLOWING 30 DAYS
 PRIOR TO PROJECT COMMENCEMENT FOR REVIEW.
 IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEVELOP
 AN EROSION CONTROL PLAN THAT PROVIDES A DETAILED
 DESCRIPTION OF ALL EROSION AND SEDIMENT CONTROLS, BMPS,
 AND MEASURES THAT WILL BE IMPLEMENTED AT THE
 CONSTRUCTION SITE FOR EACH ACTIVITY. CONTRACTOR IS
 RESPONSIBLE FOR PROVIDING TIMEFRAMES IN WHICH THE
 CONTROLS WILL BE IMPLEMENTED, MAINTAINED AND REMOVED.
 THIS INFORMATION SHALL BE KEPT AT THE PROJECT FIELD
 OFFICE IN ORDER FOR THE PROJECT TO BE CONSIDERED IN
 COMPLIANCE WITH THE FDEP GENERIC PERMIT FOR STORMWATER
 DISCHARGE FROM LARGE AND SMALL CONSTRUCTION SITES.
  
 THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THE
 FOLLOWING ITEMS ARE ON SITE:
 1. COPY OF THE SWPPP WITH THE ORIGINAL CERTIFICATION
 SIGNATURES.
 2. COPY OF THE CONTRACTOR'S EROSION CONTROL PLAN.
 3. HAZARDOUS SPILL CONTROL PLAN WITH GUIDELINES ON
 CONTACTING THE 24-HOUR EMERGENCY RESPONSE PROGRAM FOR
 HAZARDOUS MATERIAL SPILLS. THIS SHALL INCLUDE COPIES OF
 DISCHARGE NOTIFICATIONS THAT HAVE OCCURRED WITHIN THE
 PROJECT LIMITS.
 4. COMPLETED INSPECTION FORMS.
  
 PLEASE FEEL FREE TO CONTACT ME SHOULD YOU HAVE ANY
 QUESTIONS.
 THANK YOU!
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  